Installing a high-speed diaper production line to strict tolerances, with zero accidents.

232 containers, zero accidents, two months
Healthcare manufacturers installing high-speed production lines need hygiene, precision and safety maintained throughout, since any lapse can affect both product quality and worker safety. Beck & Pollitzer supported a leading global healthcare manufacturer with the installation of a high-speed diaper production line and integrated acoustic housing, working alongside a Japanese logistics provider and a specialist system integrator.
The installation required receiving and unpacking 232 containers of equipment and erecting it to strict tolerance requirements, all within a two-month programme.
Site prep through to erection, coordinated across three partners
Site preparation and set-up to meet project specifications |
Receiving, unloading and unpacking of 232 containers with precision handling protocols |
Internal logistics and equipment handling within the facility |
Mechanical installation and equipment erection to strict tolerance requirements |
Full technical supervision throughout, aligned to engineering standards and milestones |
Site preparation and set-up to meet project specifications |
Receiving, unloading and unpacking of 232 containers with precision handling protocols |
Internal logistics and equipment handling within the facility |
Mechanical installation and equipment erection to strict tolerance requirements |
Full technical supervision throughout, aligned to engineering standards and milestones |
-
Site preparation and set-up to meet project specifications
-
Receiving, unloading and unpacking of 232 containers with precision handling protocols
-
Internal logistics and equipment handling within the facility
-
Mechanical installation and equipment erection to strict tolerance requirements
-
Full technical supervision throughout, aligned to engineering standards and milestones
Coordination between Beck & Pollitzer’s installation team and the logistics and integration partners kept every milestone on schedule, reflecting the same engineering services approach applied across FMCG and life sciences installations.
4,500 hours, zero accidents, on schedule
With technical supervision maintained throughout, the installation was completed to the building-tolerance requirements specified for the high-speed production line, across 4,500 project hours without incident.
The result strengthened Beck & Pollitzer’s presence in the healthcare and FMCG sectors, giving the client a production line ready to run at the precision and hygiene standards their industry demands.
Need to know more?
- Client: Global healthcare manufacturer
- Location: France
- Sector: Life Sciences & Pharmaceutical / FMCG
- Programme: Machinery installation
- Timeline: 2 months

Hygiene and medical production line relocation in the Tula region
- 2 sites Relocation
- mechanical + electrical dismantling and reassembly Scope
- compressed air + fire suppression Utilities

Complex pharmaceutical machinery installation in Belgium
- 60,000+ Project hours
- 18 months Duration
- up to 25 On-site fitters

Pharmaceutical machinery installation in Belgium
- 16,200+ Project hours
- 100 Machines
- 40+ Tanks

Rubber glove production line installation in the Tula region
- steel structures, furnaces, chain and exhaust systems + electrical installation Scope
- included Commissioning support

Multi-floor relocation of fragile printing equipment for a pharmaceutical manufacturer
- 8 Machines relocated
- 500 kg Heaviest unit
- 5,000 x 800 x 1,100 mm Largest units

Relocation of two pharmaceutical autoclaves in freezing outdoor conditions
- 2,500 kg Autoclave 1
- 850 kg Autoclave 2
- -2°C with snowfall Delivery conditions

Complex production tank rigging & installation in Poland
- 40 Project hours
- 1 day Duration
- 4 Team size

Coffee roasting plant installation and assembly in Sweden
- 20 On-site specialists
- 1 year Planned programme duration
- Järfälla, Sweden Location