Passer au contenu principal
Turnkey hygiene production line installation in France

Installing a high-speed diaper production line to strict tolerances, with zero accidents.

France

232 containers, zero accidents, two months

Healthcare manufacturers installing high-speed production lines need hygiene, precision and safety maintained throughout, since any lapse can affect both product quality and worker safety. Beck & Pollitzer supported a leading global healthcare manufacturer with the installation of a high-speed diaper production line and integrated acoustic housing, working alongside a Japanese logistics provider and a specialist system integrator.

The installation required receiving and unpacking 232 containers of equipment and erecting it to strict tolerance requirements, all within a two-month programme.


Site prep through to erection, coordinated across three partners

Site preparation and set-up to meet project specifications
Receiving, unloading and unpacking of 232 containers with precision handling protocols
Internal logistics and equipment handling within the facility
Mechanical installation and equipment erection to strict tolerance requirements
Full technical supervision throughout, aligned to engineering standards and milestones
Site preparation and set-up to meet project specifications
Receiving, unloading and unpacking of 232 containers with precision handling protocols
Internal logistics and equipment handling within the facility
Mechanical installation and equipment erection to strict tolerance requirements
Full technical supervision throughout, aligned to engineering standards and milestones
Site preparation and set-up to meet project specifications
Receiving, unloading and unpacking of 232 containers with precision handling protocols
Internal logistics and equipment handling within the facility
Mechanical installation and equipment erection to strict tolerance requirements
Full technical supervision throughout, aligned to engineering standards and milestones
Site preparation and set-up to meet project specifications
Receiving, unloading and unpacking of 232 containers with precision handling protocols
Internal logistics and equipment handling within the facility
Mechanical installation and equipment erection to strict tolerance requirements
Full technical supervision throughout, aligned to engineering standards and milestones
  • Site preparation and set-up to meet project specifications
  • Receiving, unloading and unpacking of 232 containers with precision handling protocols
  • Internal logistics and equipment handling within the facility
  • Mechanical installation and equipment erection to strict tolerance requirements
  • Full technical supervision throughout, aligned to engineering standards and milestones

Coordination between Beck & Pollitzer’s installation team and the logistics and integration partners kept every milestone on schedule, reflecting the same engineering services approach applied across FMCG and life sciences installations.


4,500 hours, zero accidents, on schedule

With technical supervision maintained throughout, the installation was completed to the building-tolerance requirements specified for the high-speed production line, across 4,500 project hours without incident.

The result strengthened Beck & Pollitzer’s presence in the healthcare and FMCG sectors, giving the client a production line ready to run at the precision and hygiene standards their industry demands.

Project hours
4,500
Duration
2 months
Containers unloaded
232
Safety incidents
0

Need to know more?

Why did the containers need precision handling protocols during unloading?
The 232 containers held equipment for a high-speed production line where tight tolerances matter from the first stage of installation, so handling protocols were applied from unloading onward rather than only during final erection.
Why was full technical supervision maintained throughout the project?
Keeping supervision continuous, rather than periodic, meant the installation could be held to the building-tolerance requirements specified for the high-speed production line throughout.
Project Details
  • Client: Global healthcare manufacturer
  • Location: France
  • Sector: Life Sciences & Pharmaceutical / FMCG
  • Programme: Machinery installation
  • Timeline: 2 months

Related Projects

Beck & Pollitzer Industrial Intelligence™

Industrial insight drawn from real-world delivery. Explore reports, articles and expert perspectives on the challenges shaping modern manufacturing and industrial programmes.
What manufacturers should consider before relocating production →
8 min

What manufacturers should consider before relocating production →

5 min read

What manufacturers should consider before relocating production →

5 min read

Your next project starts here

Whether you’re exploring an opportunity, planning a facility or preparing for installation,
our specialists can help you take the next step with confidence.
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.