Industrial delivery for consumer goods manufacturing
For consumer goods manufacturers, launch dates and production volumes are fixed well in advance, and new equipment, line upgrades and factory moves often have to be delivered while existing output continues. Beck & Pollitzer delivers the installation, modification and relocation work needed to bring new and upgraded production lines into service.
Our consumer goods experience includes work for Procter & Gamble, Kimberly-Clark, Dr. Oetker and Zott International, spanning food and beverage, household appliance and hygiene-product manufacturing across international markets. The same site team manages each programme from initial equipment survey through to commissioning, giving one point of contact throughout the work.
Four areas of coverage
Food & beverage production systems
Food and beverage facilities combine process machinery, silos, piping, material handling and supporting structures across connected production areas. New installations, plant upgrades and process-line changes are delivered through our process and production-line equipment installation, from initial positioning through to full production start-up.
- Mixers, blenders and process vessels
- Silos, tanks and ingredient-handling systems
- SS 304 pipework, platforms and supporting structures
- Filtration, exhaust-air handling and conveying systems

Household appliance manufacturing
Household-appliance production relies on connected assembly equipment, utilities and material-handling systems operating across multiple stages, where individual assets have to keep their exact position and sequence through any move. Complete line transfers and factory consolidations draw on our appliance production-line transfer.
- Major appliance and white-goods assembly lines
- Robotic production cells and conveyor systems
- Mechanical, electrical and piping disconnection
- Reassembly, setting and production start-up support
Hygiene & high-speed consumer production
High-speed hygiene and personal-care lines combine sensitive production equipment, tightly controlled tolerances and demanding installation schedules, where machinery, acoustic enclosures and utilities all have to be positioned to fine tolerances. High-speed line positioning and dimensional verification supports the checks these lines depend on.
- High-speed production-line installation
- Precision equipment positioning and alignment
- Acoustic enclosures and supporting structures
- Aspiration systems and palletising equipment
Consumer goods plant relocation & consolidation
Consumer goods manufacturers may need to consolidate production, transfer complete lines between sites or relocate a factory internationally while protecting launch dates and machine-to-utility interfaces. Consumer-goods production transfer and consolidation brings equipment survey, dismantling, logistics, reinstallation and commissioning together within a single programme.
- International production-line transfers
- Equipment survey, dismantling and packing
- Heavy-lift rigging using mobile cranes and forklifts
- Reinstallation, commissioning and start-up support

Turnkey hygiene production line installation in France
- 4,500 Project hours
- 2 months Duration
- 232 Containers unloaded

Complex production tank rigging & installation in Poland
- 40 Project hours
- 1 day Duration
- 4 Team size

Coffee roasting plant installation and assembly in Sweden
- 20 On-site specialists
- 1 year Planned programme duration
- Järfälla, Sweden Location

Cosmetic bottling line relocation: Ohio to Texas
- 42 Components relocated
- 13,000+ lbs Heaviest component
- 4 weeks Timeline

Mechanical and electrical canning line installation in a live plant
- 79 Operatives
- ~60 tons Power and control cable
- ~15 tons Cable routes

Installation of three 28-metre agricultural grain silos in Hungary
- 3 Silos installed
- 28 m Installation height
- 80,000+ Screws used

Fridge production line dismantling and relocation programme
- 2 Production lines
- 42 Vehicles deployed
- 10 Listed machines/components

Refrigerator production line relocation: Hungary to Egypt
- 250+ Machines assembled
- 2 Countries
- 3 Teams collaborating

Internal washing-machine drum line relocation near Milan
- 2 Countries supporting delivery
- internal plant move Relocation type
- washing-machine drum production lines Equipment

Autostore installation for a clothing distribution centre in North Carolina
- 1,444 Grid cells
- 36 Robots
- service + overhang mezzanines Systems
Programme delivery & site safety
Consumer goods programmes often continue running production while installation work takes place nearby, with multiple contractors, OEM teams and utilities sharing the same footprint. Through contractor and production-window coordination, equipment arrivals, contractor access and production windows are aligned to the programme schedule. Isolations, lifting activity and hygiene zoning are managed through hygiene-zone and simultaneous-work safety controls, with site activities planned around operating production areas.

Beck & Pollitzer Industrial Intelligence™

Need to know more?
Yes. Our consumer goods work spans food and beverage, household appliances, hygiene and personal-care manufacturing. The delivery model is adapted to each production environment, from sanitary and hygiene-controlled facilities to high-speed assembly and packaging operations.
Installation is planned around stainless-steel and sanitary-grade fittings, controlled access and the facility’s own hygiene protocols. On one food-manufacturing project in India, 95 personnel installed interconnecting stainless-steel pipework and a 110-tonne platform structure alongside insulation and supporting works. See Production line installation for a large food manufacturer in India.
Yes. Specialist process systems can be installed alongside conveyors, platforms, utilities and supporting production equipment as part of one coordinated programme. On a coffee-roasting plant in Sweden, a 20-person specialist team worked across a year-long programme covering dust filtration, green-coffee systems, roasting machinery, exhaust-air purification, steel platforms and conveyors. See Precision assembly for a coffee-roasting plant in Sweden.
Yes. Equipment surveys, including 3D scanning where useful, support accurate reassembly at the destination. One documented programme relocated 13 refrigerator production lines and more than 250 machines between two countries, coordinated across three Beck & Pollitzer branches.
Yes. Work is sequenced into agreed windows around the production schedule, with equipment positioned, connected and tested while adjacent lines keep running. Isolations, temporary barriers and access controls separate live production areas from the installation zone, and mechanical and electrical tie-ins are scheduled for the shortest practical stoppage, so restart dates are protected throughout the programme.