Life Sciences & Pharmaceutical
Industrial delivery for regulated pharmaceutical, healthcare and life sciences environments
Pharmaceutical and life sciences projects combine sensitive equipment, regulated production environments and tightly controlled handover requirements. New lines, facility upgrades and equipment moves may need to be delivered around cleanroom protocols, validation activity and live operations. Beck & Pollitzer supports these programmes from machinery installation and utility integration through to specialist equipment relocation, commissioning support and decommissioning.
Our life sciences and pharmaceutical experience spans regulated manufacturing, cleanroom environments, laboratory facilities and specialist medical technology across Europe, the United States and Asia. We support projects from individual equipment installations and production-line upgrades through to major facility programmes, international relocations and highly controlled medical-system installations.
Four areas of coverage
Pharmaceutical production lines
Production equipment has to be installed around OEM interfaces, process sequencing and validation requirements without compromising the controlled manufacturing environment. Beck & Pollitzer supports regulated production-line installation from offloading and positioning through mechanical and electrical integration and commissioning support.
- Syringe and vial production lines
- Fill-finish, inspection and packaging systems
- Autoclaves, lyophilisers and isolators
- Tanks, vessels, pumps and process equipment

Cleanroom process & utility systems
Cleanroom projects require installation activity to be coordinated with contamination controls, access zoning and the utilities serving production equipment. Our teams can deliver mechanical, electrical and secondary service connections across regulated environments, including cleanroom utility and equipment integration where multiple disciplines need to be coordinated under one programme.
- Process and utility pipework
- Electrical distribution, cable trays and cabling
- HVAC and cleanroom support equipment
- Equipment hook-up and validation support

Medical imaging & therapy equipment
High-value diagnostic and therapeutic systems can combine heavy components with sensitive alignment and restricted access requirements. Installation can include specialist lifting, final positioning and medical-system positioning and alignment for equipment where geometry and calibration are critical to performance.
- MRI, CT and PET systems
- Cyclotrons and proton therapy equipment
- Linear accelerators and treatment systems
- Diagnostic and therapeutic device equipment

Laboratory & specialist equipment relocation
Laboratory and medical equipment moves require more than transport. Sensitive instruments, calibrated components and specialist production assets may need phased dismantling, protected handling, cross-border logistics and controlled reinstallation. Laboratory and medical equipment relocation supports local and international moves from individual assets through to wider facility transfers.
- Laboratory and diagnostic equipment
- Medical and scientific instruments
- Sensitive production and testing equipment
- Phased relocation and temporary staging


Turnkey hygiene production line installation in France
- 4,500 Project hours
- 2 months Duration
- 232 Containers unloaded

Multi-floor relocation of fragile printing equipment for a pharmaceutical manufacturer
- 8 Machines relocated
- 500 kg Heaviest unit
- 5,000 x 800 x 1,100 mm Largest units

Relocation of two pharmaceutical autoclaves in freezing outdoor conditions
- 2,500 kg Autoclave 1
- 850 kg Autoclave 2
- -2°C with snowfall Delivery conditions

Complex pharmaceutical machinery installation in Belgium
- 60,000+ Project hours
- 18 months Duration
- up to 25 On-site fitters

Pharmaceutical machinery installation in Belgium
- 16,200+ Project hours
- 100 Machines
- 40+ Tanks

Hygiene and medical production line relocation in the Tula region
- 2 sites Relocation
- mechanical + electrical dismantling and reassembly Scope
- compressed air + fire suppression Utilities

Rubber glove production line installation in the Tula region
- steel structures, furnaces, chain and exhaust systems + electrical installation Scope
- included Commissioning support
Programme delivery & site safety
Work inside pharmaceutical and life sciences facilities has to move from construction into qualification and handover without compromising cleanroom controls or the status of adjacent operations. Our regulated installation and handover planning coordinates OEM interfaces, clean-build sequencing, utilities, testing and validation activities against the programme.
Access zoning, cleanroom-ready tools and PPE, isolation controls, lifting activity and agreed methods for working around sensitive or operational areas fall under controlled-environment work planning.

Beck & Pollitzer Industrial Intelligence™

Need to know more?
Yes. Our teams support greenfield installations, brownfield upgrades, production-line changes and wider facility programmes. In operating sites, work can be phased around existing production, access controls and validation requirements, with installation and commissioning activity planned to reduce disruption to surrounding operations.
Projects are planned around site-specific GMP requirements, OEM interfaces, access restrictions, utilities, validation activity and handover requirements. Installation sequencing, testing and commissioning support are coordinated so equipment can move from construction through qualification in a controlled way.
Yes. Our teams work within controlled environments using project-specific clean-build procedures, access zoning, approved tools and PPE, contamination-control measures and agreed methods of work, coordinated to protect cleanroom classification and adjacent live production throughout the installation programme.
Yes. Beck & Pollitzer supports local and international relocation of laboratory and medical equipment, including sensitive and high-value assets. Scope can include route planning, dismantling, protected handling, specialist packing, transport, positioning and reinstallation depending on the equipment and facility requirements.
Yes. On a proton beam therapy installation in Spain, Beck & Pollitzer handled more than 220 tonnes of equipment using 400-tonne cranes for roof access, completed mechanical, electrical and instrumentation integration, and installed more than 40 km of cabling. Proton Beam Therapy installation in Spain