Pharmaceutical machinery installation in Belgium

Installing 100 machines, more than 40 tanks and 10 tonnes of steel platforms across a 16-month pharmaceutical programme.

Belgium

The Challenge

Installing heavy pharmaceutical equipment across cleanroom and utility scopes

Our team in France carried out a 16-month machinery installation programme for a Japanese multinational pharmaceutical company in Belgium. The scope combined the handling of 35-ton equipment and the installation of production machinery with piping, site utilities and installation work within designated cleanroom environments.


Our Solution

Machinery, logistics, piping and cleanroom installation under one programme

Our team handled the unloading, lifting and precise positioning of 35-ton equipment within the facility, along with the installation of machinery units, including their mechanical and electrical components. Logistics specialists provided truck transport and material storage throughout the project.

The wider scope included process piping, building partitions and heating systems, and equipment installation within cleanroom environments under strict cleanroom protocols. More than 60 personnel supported the programme, including project managers, site managers, safety specialists, logistics coordinators and supervisors.

Truck transport and material storage throughout the project
Process piping, building partitions and heating systems
Installation within designated cleanroom environments
Forklifts and MEWPs for material handling and access
100-ton crane and 6-ton telescopic crane for lifting operations
Truck transport and material storage throughout the project
Process piping, building partitions and heating systems
Installation within designated cleanroom environments
Forklifts and MEWPs for material handling and access
100-ton crane and 6-ton telescopic crane for lifting operations
Truck transport and material storage throughout the project
Process piping, building partitions and heating systems
Installation within designated cleanroom environments
Forklifts and MEWPs for material handling and access
100-ton crane and 6-ton telescopic crane for lifting operations
Truck transport and material storage throughout the project
Process piping, building partitions and heating systems
Installation within designated cleanroom environments
Forklifts and MEWPs for material handling and access
100-ton crane and 6-ton telescopic crane for lifting operations
  • Truck transport and material storage throughout the project
  • Process piping, building partitions and heating systems
  • Installation within designated cleanroom environments
  • Forklifts and MEWPs for material handling and access
  • 100-ton crane and 6-ton telescopic crane for lifting operations

The Outcome

100 machines and 40+ tanks installed across 16 months

The programme installed more than 40 tanks, 100 machines and 10 tonnes of steel platforms across more than 16,200 project hours. The project was completed on time and in line with safety regulations and client requirements.

Project hours
16,200+
Machines
100
Tanks
40+
Steel platforms
10 tonnes
Personnel
60+
Project Details
  • Client: Japanese multinational pharmaceutical company
  • Location: Belgium
  • Sector: Life Sciences & Pharmaceutical
  • Programme: Machinery, piping and utility installation
  • Timeline: 16 months (started 2023)

Related Projects

Beck & Pollitzer Industrial Intelligence™

Industrial insight drawn from real-world delivery. Explore reports, articles and expert perspectives on the challenges shaping modern manufacturing and industrial programmes.
What manufacturers should consider before relocating production →
8 min

What manufacturers should consider before relocating production →

5 min read

What manufacturers should consider before relocating production →

5 min read

Your next project starts here

Whether you’re exploring an opportunity, planning a facility or preparing for installation,
our specialists can help you take the next step with confidence.