Relocating 20 pieces of production equipment between two live facilities without disrupting ongoing production.

Relocating 20 pieces of equipment between two facilities running full production
Our team is relocating 20 pieces of equipment for a building products manufacturer between two sister facilities in Lincolnton, North Carolina, ranging from small standalone units to large, multi-assembly machinery lines. Both plants remain in full production, so the work has to be coordinated with production activities to cause the least possible disruption.
A 30-ton forklift for the heaviest component, a 20,000+ lb press machine
Each piece of equipment was disassembled, disconnected and palletised into shipping pieces before transport to the destination facility, where it was offloaded, reassembled and reconnected. The heaviest subassembly, a sandpaper punch press machine weighing over 20,000 lb, was lifted, loaded and unloaded using a 30-ton forklift. With both plants running in full production throughout, the team coordinated closely with on-site production activity to keep disruption to a minimum.
Disassembly, disconnection and palletising of 20 pieces of equipment for shipping |
Transport between sister facilities in Lincolnton, North Carolina |
Offloading, reassembly and reconnection at the destination site |
Use of a 30-ton forklift for the heaviest component, a 20,000+ lb press machine |
Coordination with live production activity at both origin and destination facilities |
Disassembly, disconnection and palletising of 20 pieces of equipment for shipping |
Transport between sister facilities in Lincolnton, North Carolina |
Offloading, reassembly and reconnection at the destination site |
Use of a 30-ton forklift for the heaviest component, a 20,000+ lb press machine |
Coordination with live production activity at both origin and destination facilities |
-
Disassembly, disconnection and palletising of 20 pieces of equipment for shipping
-
Transport between sister facilities in Lincolnton, North Carolina
-
Offloading, reassembly and reconnection at the destination site
-
Use of a 30-ton forklift for the heaviest component, a 20,000+ lb press machine
-
Coordination with live production activity at both origin and destination facilities
First major milestone reached at the project’s midpoint
At the project’s midpoint, the complete installation of the press machine had been achieved, marking the first major milestone of the eight-week programme. Work is continuing to relocate the remaining equipment between the two facilities.
Need to know more?
- Client: Building products manufacturer
- Location: Lincolnton, North Carolina, USA
- Sector: Building Products
- Programme: Production line relocation between sister facilities
- Timeline: 8 weeks (planned)

Cross-border production cell relocation for a glass manufacturer
- 4 Dedicated trucks
- 2 Countries
- 0 Production delays

Production line relocation from Germany to the United Kingdom
- 2 Countries
- match-marking + disconnection + dismantling Origin scope
- press + equipment reinstallation Destination scope

Plywood and LVL production facility installation in France
- 12 months Programme length
- France Country
- Thébault Group Client

Overhead installation of a six-section curing oven system
- 6 Oven sections installed
- 30-40 tonnes each Section weight
- 500 tonnes Crane capacity

Technical rigging & retrofit: integrating a Gigafactory with more than 3,500 assets
- 29,467 Project hours
- 117 days Duration
- 3,506 Items relocated

Multi-floor relocation of fragile printing equipment for a pharmaceutical manufacturer
- 8 Machines relocated
- 500 kg Heaviest unit
- 5,000 x 800 x 1,100 mm Largest units

Relocation of two pharmaceutical autoclaves in freezing outdoor conditions
- 2,500 kg Autoclave 1
- 850 kg Autoclave 2
- -2°C with snowfall Delivery conditions

Production line relocation in Italy
- 2,900 Project hours
- 21 days Duration
- 12 On-site team