Automotive process and welding installation in northern France

Installing a new automotive process and welding equipment with mechanical and electrical scope while additional COVID-era health controls were in place.

France

Installing new process equipment while additional site-health controls were in force

The global car manufacturer required support for installation of a new process at its northern France facility during the COVID period. The scope included new welding equipment together with mechanical and electrical work.


Assembly, mounting and electrical work delivered under enhanced site-health requirements

The installation work covered assembly and mounting of the new process equipment plus mechanical and electrical installation of the welding systems.

PPE, additional healthcare measures and the applicable government safety guidance formed part of the Health & Safety controls during delivery.

Assembly and mounting of new process equipment
Mechanical installation
Electrical installation
New welding equipment included
PPE and additional COVID-era health measures applied
Government safety guidance followed on site
Assembly and mounting of new process equipment
Mechanical installation
Electrical installation
New welding equipment included
PPE and additional COVID-era health measures applied
Government safety guidance followed on site
Assembly and mounting of new process equipment
Mechanical installation
Electrical installation
New welding equipment included
PPE and additional COVID-era health measures applied
Government safety guidance followed on site
Assembly and mounting of new process equipment
Mechanical installation
Electrical installation
New welding equipment included
PPE and additional COVID-era health measures applied
Government safety guidance followed on site
  • Assembly and mounting of new process equipment
  • Mechanical installation
  • Electrical installation
  • New welding equipment included
  • PPE and additional COVID-era health measures applied
  • Government safety guidance followed on site

Mechanical and electrical installation of the new automotive process and welding equipment

The programme combined mechanical and electrical installation with the additional health controls required during the COVID period.

Scope
mechanical + electrical installation
Equipment
new welding systems
Site controls
PPE + COVID-era health measures
Project Details
  • Client: Global car manufacturer
  • Location: Northern France
  • Sector: Automotive
  • Programme: New process and welding equipment installation

Related Projects

Beck & Pollitzer Industrial Intelligence™

Industrial insight drawn from real-world delivery. Explore reports, articles and expert perspectives on the challenges shaping modern manufacturing and industrial programmes.
What manufacturers should consider before relocating production →
8 min

What manufacturers should consider before relocating production →

5 min read

What manufacturers should consider before relocating production →

5 min read

Your next project starts here

Whether you’re exploring an opportunity, planning a facility or preparing for installation,
our specialists can help you take the next step with confidence.
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.