Relocating dismantled production technologies from Norderstedt to Vrskmaň on a two-week mobilisation schedule.

Mobilising quickly for a cross-border relocation with a fixed new-site layout
The client needed a cross-border machinery relocation of dismantled production technologies from its German division in Norderstedt to a new production facility in Vrskmaň. The scope covered loading, secure transport and positioning in line with a provided layout, and the project was time-sensitive: the Request for Quotation was received on 10 May and work started on 24 May.
Five-person crew using a 5-ton forklift and scissor lift for loading and final positioning
A five-person team loaded the dismantled technologies in Germany, managed transport to the Czech Republic, then unloaded and positioned the equipment at the destination in line with the supplied layout. A 5-ton forklift and scissor lift supported the handling work.
Loading of dismantled production technologies at the German site |
Cross-border transport from Norderstedt to Vrskmaň |
Unloading and positioning to the client’s supplied layout |
5-ton forklift and scissor lift used for equipment handling |
Five operatives deployed on the relocation programme |
Loading of dismantled production technologies at the German site |
Cross-border transport from Norderstedt to Vrskmaň |
Unloading and positioning to the client’s supplied layout |
5-ton forklift and scissor lift used for equipment handling |
Five operatives deployed on the relocation programme |
-
Loading of dismantled production technologies at the German site
-
Cross-border transport from Norderstedt to Vrskmaň
-
Unloading and positioning to the client’s supplied layout
-
5-ton forklift and scissor lift used for equipment handling
-
Five operatives deployed on the relocation programme
Technology lines positioned at the new Czech facility on time
The relocation was completed on time, with the technologies moved from Germany and positioned at the new facility in Vrskmaň.
- Client: Materials handling technology manufacturer
- Location: Norderstedt, Germany to Vrskmaň, Czech Republic
- Sector: Other Industries
- Programme: Cross-border production technology relocation

Production line relocation in Italy
- 2,900 Project hours
- 21 days Duration
- 12 On-site team

Turnkey machinery relocation for an electrical components manufacturer
- 3,000 Project hours
- 5 operatives Core team
- match-marking through to reassembly Scope

Extrusion line and crystalliser move: Italy to Belgium
- 17 days Timeline
- 5 Trucks
- extrusion line, crystalliser and dosing units Equipment

Extruder line transfer from Germany to Hungary without OEM support
- 2 months Programme duration
- 10 Transport vehicles
- 2 Countries

30,000 lb laser cutter offload and relocation in South Carolina
- 30,000 lb Laser cutter weight
- 40,000 lb Shear press previously moved
- 2 days Planned duration

Internal relocation of three presses in Homberg, Germany
- 3 Presses relocated
- 44 tonnes Maximum machine weight
- 3 weeks Timeline

Production equipment move to a fourth-floor installation area in the Czech Republic
- 528 Project hours
- 7 operatives Team
- 5 tonnes Forklifts

Relocation of 26 production machines within Italy
- 26 Machines relocated
- 400 tonnes Total weight
- 85t Heaviest machine