30-tonne turbine installation and pipe connection in France

Unloading, positioning and connecting turbine equipment weighing up to 30 tonnes, followed by pressure testing and modifications.

France

Positioning 30-tonne equipment without losing time in the installation schedule

The turbine installation required heavy equipment to be unloaded and positioned before the main pipe connection could be made. The heaviest item weighed 30 tonnes, and the project team identified positioning as a potential source of schedule delay.


Equipment positioning followed by pipe connection, pressure testing and modifications

The machinery installation began with unloading and positioning the turbine equipment. The team then connected the turbine to the main pipe connection, carried out pressure tests and completed the required modifications.

Heavy handling was planned under the project health and safety requirements because of the equipment weight.


Turbine installation completed on time

The positioning challenge was managed without schedule loss, and the turbine installation was completed on time.

Heaviest equipment
30 tonnes
Scope
positioning + pipe connection + pressure testing + modifications
Project Details
  • Client: Turbine equipment manufacturer
  • Location: France
  • Sector: Other Industries
  • Programme: Turbine installation and pressure testing
  • Timeline: Completed on time

Related Projects

Beck & Pollitzer Industrial Intelligence™

Industrial insight drawn from real-world delivery. Explore reports, articles and expert perspectives on the challenges shaping modern manufacturing and industrial programmes.
What manufacturers should consider before relocating production →
8 min

What manufacturers should consider before relocating production →

5 min read

What manufacturers should consider before relocating production →

5 min read

Your next project starts here

Whether you’re exploring an opportunity, planning a facility or preparing for installation,
our specialists can help you take the next step with confidence.
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.