Passer au contenu principal
Bespoke customer fulfilment centre installation in Japan

Installing the first bespoke customer fulfilment centre in Asia Pacific, designed to withstand regional earthquake conditions.

Japan

Installing the first bespoke CFC in Asia Pacific

Beck & Pollitzer installed the first bespoke customer fulfilment centre (CFC) in Asia Pacific for client Ocado Group and its partner AEON, at Honda-cho, Midori-ku, Chiba City. It was Beck & Pollitzer’s first project in Japan, and the CFC was specifically designed to withstand the earthquakes that can affect the region.


A CFC designed for the region’s seismic conditions, delivered with partner Sankyu

The CFC uses Ocado’s Smart Platform technology, an end-to-end system supporting the site’s logistics and fulfilment capabilities. Our team collaborated closely with partner Sankyu to deliver a CFC specifically designed to withstand the earthquakes that can affect the region.

Installation of Ocado’s Smart Platform technology for logistics and fulfilment
Design and delivery adapted to withstand regional earthquake conditions
Collaboration with partner Sankyu throughout the installation
Installation of Ocado’s Smart Platform technology for logistics and fulfilment
Design and delivery adapted to withstand regional earthquake conditions
Collaboration with partner Sankyu throughout the installation
Installation of Ocado’s Smart Platform technology for logistics and fulfilment
Design and delivery adapted to withstand regional earthquake conditions
Collaboration with partner Sankyu throughout the installation
Installation of Ocado’s Smart Platform technology for logistics and fulfilment
Design and delivery adapted to withstand regional earthquake conditions
Collaboration with partner Sankyu throughout the installation
  • Installation of Ocado’s Smart Platform technology for logistics and fulfilment
  • Design and delivery adapted to withstand regional earthquake conditions
  • Collaboration with partner Sankyu throughout the installation

First bespoke CFC in Asia Pacific successfully installed

The CFC was installed successfully and on time, marking Beck & Pollitzer’s first project in Japan and the first bespoke CFC of its kind in Asia Pacific. The completed facility incorporates the seismic requirements developed for the region and uses Ocado’s Smart Platform technology for logistics and fulfilment. Delivery was coordinated with Sankyu for client Ocado Group and project partner AEON.

Location
Chiba City, Japan
Region
First CFC of its kind in Asia Pacific

Need to know more?

Why was the CFC designed to withstand earthquakes specifically?
The facility is located in a region affected by earthquakes, which is why the CFC was designed and delivered to withstand seismic activity as part of its build.
Why did the project involve partner Sankyu?
Beck & Pollitzer collaborated with long-standing partner Sankyu to deliver the CFC, drawing on that partnership for this first project in Japan.
Project Details
  • Client: Ocado Group
  • Location: Chiba City, Japan
  • Sector: Warehouse Automation
  • Programme: Customer fulfilment centre installation

Related Projects

Beck & Pollitzer Industrial Intelligence™

Industrial insight drawn from real-world delivery. Explore reports, articles and expert perspectives on the challenges shaping modern manufacturing and industrial programmes.
What manufacturers should consider before relocating production →
8 min

What manufacturers should consider before relocating production →

5 min read

What manufacturers should consider before relocating production →

5 min read

Your next project starts here

Whether you’re exploring an opportunity, planning a facility or preparing for installation,
our specialists can help you take the next step with confidence.
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.