Installing three sets of warehouse steel structures for a -27°C automated warehouse, with less than 50 mm between the stacker crane and ceiling.

Installing an automated warehouse with less than 50 mm overhead clearance
The dairy producer required a fully automated warehouse system designed to operate at -27°C. The main installation constraint was the space above the stacker crane: at its highest point, less than 50 mm remained between the crane and the room ceiling.
The project therefore combined warehouse automation installation with a very tight positioning tolerance inside the cold-store structure.
Forty-five installation specialists supported by engineering and safety supervision
The site team comprised 45 installation specialists, two engineers and one safety engineer under the project manager. They installed three sets of steel structures for the warehouse complex, including automatic product loading and unloading systems.
With less than 50 mm between the highest point of the stacker crane and the ceiling, all work had to be carried out with pinpoint precision.
Installation of three sets of warehouse-complex steel structures |
Automatic loading and unloading systems installed as part of the warehouse scope |
45 installation specialists supported by two engineers and one safety engineer |
Work carried out with less than 50 mm between the stacker crane and the ceiling |
Installation of three sets of warehouse-complex steel structures |
Automatic loading and unloading systems installed as part of the warehouse scope |
45 installation specialists supported by two engineers and one safety engineer |
Work carried out with less than 50 mm between the stacker crane and the ceiling |
-
Installation of three sets of warehouse-complex steel structures
-
Automatic loading and unloading systems installed as part of the warehouse scope
-
45 installation specialists supported by two engineers and one safety engineer
-
Work carried out with less than 50 mm between the stacker crane and the ceiling
Automated warehouse installation completed on time
The automated warehouse project was completed on time. The installed system was designed for operation at -27°C.
- Client: Dairy producer
- Location: Russia
- Sector: Warehouse Automation; Consumer Goods
- Programme: Automated warehouse installation

Autostore installation for a clothing distribution centre in North Carolina
- 1,444 Grid cells
- 36 Robots
- service + overhang mezzanines Systems

AS/RS installation with 19 aisle cranes in Ohio
- 19 Aisle cranes
- cranes + pallet conveyors Main systems
- zero reported incidents/accidents Safety outcome

AutoStore installation for an online food retailer in Texas
- AutoStore + conveyor infrastructure Systems
- conveyor delivery delay Constraint
- AutoStore work reprioritised Programme response

Bespoke customer fulfilment centre installation in Japan
- Chiba City, Japan Location
- First CFC of its kind in Asia Pacific Region

Warehouse automation installations across four tyre-manufacturing sites
- 200,000+ Project hours
- 4 Client locations
- 2 Countries

Automated warehouse capacity expansion in Germany
- 80 Sorting stations installed
- 350+ Autonomous robots inducted
- 30 Vehicles unloaded

Electrical controls installation for an automated warehouse in Warrington
- 20 PLC cabinets
- 88 miles Control cable
- 6,500 m conveyor + 1,800 m shuttle Containment

High-security automated document storage system installation
- 24,000+ Grid cells
- 140 Robots
- 3 Chambers
Beck & Pollitzer Industrial Intelligence™