Installing more than 24,000 grid cells, conveyor systems and 140 robots across three linked chambers under strict document-security controls.

Building a large automated storage system under strict security controls
The installation was designed to store around two billion pages of paper documents, including restricted material. The work therefore took place under stringent security controls while the automated storage infrastructure was assembled.
Three connected chambers combined grid, conveyor, robot and fire-door installation
The warehouse automation installation included more than 24,000 grid cells plus mechanical and electrical sections of the conveyor system.
Automated filing system completed across three connected chambers
The completed system combined the grid structure, conveyor sections, 140 robots, inter-chamber bridges and programmed fire doors within the security-controlled environment.
- Client: Confidential document-storage operator
- Location: USA
- Sector: Warehouse Automation
- Programme: Automated filing and storage system installation
- Timeline: Project awarded in 2018; completed

Bespoke customer fulfilment centre installation in Japan
- Chiba City, Japan Location
- First CFC of its kind in Asia Pacific Region

Autostore installation for a clothing distribution centre in North Carolina
- 1,444 Grid cells
- 36 Robots
- service + overhang mezzanines Systems

Automated cold-store warehouse installation for a dairy producer
- 3 sets Steel structures installed
- 45 specialists + 3 engineering/safety staff Installation team
- <50 mm Crane-to-ceiling clearance

AS/RS installation with 19 aisle cranes in Ohio
- 19 Aisle cranes
- cranes + pallet conveyors Main systems
- zero reported incidents/accidents Safety outcome

Warehouse automation installations across four tyre-manufacturing sites
- 200,000+ Project hours
- 4 Client locations
- 2 Countries

AutoStore installation for an online food retailer in Texas
- AutoStore + conveyor infrastructure Systems
- conveyor delivery delay Constraint
- AutoStore work reprioritised Programme response

Automated warehouse capacity expansion in Germany
- 80 Sorting stations installed
- 350+ Autonomous robots inducted
- 30 Vehicles unloaded

Electrical controls installation for an automated warehouse in Warrington
- 20 PLC cabinets
- 88 miles Control cable
- 6,500 m conveyor + 1,800 m shuttle Containment