Offloading, levelling and anchoring a 25,000 lb hydraulic brake press where a sloped, potholed ramp ruled out a direct trailer approach.

Moving a 25,000 lb press without a usable trailer ramp
The client needed a 25,000 lb hydraulic brake press unloaded and moved into position, but there was no accessible trailer ramp. The existing ramp was both sloped and riddled with potholes, posing significant safety risks and potential equipment damage during the heavy equipment installation.
VersaLift, 15,000 lb forklift, rigging booms and lifting bar combined for controlled movement
The team combined a VersaLift with a 15,000 lb forklift, multiple rigging booms and a heavy-duty lifting bar. The VersaLift provided height and reach, the forklift added lifting capacity, the rigging booms allowed precise manoeuvring over the uneven terrain and the lifting bar secured the handling of the press. Movements were deliberately slow and controlled until the press reached its final location, where it was levelled and anchored, with safety protocols followed throughout.
Offloading and internal movement of a 25,000 lb hydraulic brake press |
VersaLift used to provide height and reach during the move |
15,000 lb forklift used as part of the lifting arrangement |
Rigging booms and heavy-duty lifting bar used to control the load |
Final levelling and anchoring at the installation position |
Offloading and internal movement of a 25,000 lb hydraulic brake press |
VersaLift used to provide height and reach during the move |
15,000 lb forklift used as part of the lifting arrangement |
Rigging booms and heavy-duty lifting bar used to control the load |
Final levelling and anchoring at the installation position |
-
Offloading and internal movement of a 25,000 lb hydraulic brake press
-
VersaLift used to provide height and reach during the move
-
15,000 lb forklift used as part of the lifting arrangement
-
Rigging booms and heavy-duty lifting bar used to control the load
-
Final levelling and anchoring at the installation position
Brake press installed, levelled and anchored at the final position
The installation was completed, from unloading through to final levelling and anchoring.
Need to know more?
- Client: Reusable packaging solutions manufacturer
- Location: Anderson, South Carolina, USA
- Sector: Other Industries
- Programme: Hydraulic brake press installation

110-tonne and 40-tonne press installation in Žacléř
- 2 Presses installed
- 110 tonnes + 40 tonnes Press weights
- gantry + VersaLift 40/60 + 5-tonne FLT + 10-m cherry picker Handling

1,000-tonne press installation in the Czech Republic
- 1,000 tonnes Press capacity
- 500+ Project hours
- 10 hours Working day

Installation of two vertical presses in the Czech Republic
- 2 Presses installed
- 103 tons and 43 tons Press weights
- 10 hours Working day

Mechanical and electrical installation for a UK plastic recycling plant
- 2 Sorting and wash lines
- 3 Erema extruders
- 1 Water treatment plant

Robotic cell and manual assembly line installation in North Carolina
- 28 Manual stations
- 4 Robotic cells
- 15,000+ lb Heavy robot

Rigging two 1,600+ ton injection moulding machines in South Carolina
- 2 Machines
- 1,600+ tons each Weight
- 130 tons Crane

Dryer and chimney reinstallation in Ukraine
- 600 tonnes Dryer
- 8m Dryer width
- 85m Chimney height

30-tonne turbine installation and pipe connection in France
- 30 tonnes Heaviest equipment
- positioning + pipe connection + pressure testing + modifications Scope