Robotic cell and manual assembly line installation in North Carolina

Integrating 28 manual stations, four robotic cells and AGVs beneath 20-foot overhead structures, with no safety incidents.

USA

Integrating robotic cells, manual stations and AGV routes beneath overhead structures

The client needed an industrial equipment installation for a flexible, low-volume assembly line in an engine manufacturing facility, combining 28 manual stations with four robotic cells. One robot weighed more than 15,000 lb, the assembly tools were mounted on 20-foot steel overhead structures, and Automated Guided Vehicles had to move engines between stations along the floor beneath those structures.


Seventeen specialists coordinated mechanical, electrical and utility installation from nine scissor lifts

The 17-person team began in June with offloading and mechanical and electrical installation, including air and lubrication pipelines. The crew worked from nine scissor lifts, with a constant risk of falling tools and materials that made site safety the priority throughout. The assembly stations and robotic cells were coordinated and synchronised, and the AGVs were integrated into the line.

Installation of 28 manual assembly stations
Installation and integration of four robotic cells
Handling of a robot weighing more than 15,000 lb
Assembly tools mounted on 20-foot overhead steel structures
AGV routes integrated beneath the overhead equipment
Mechanical and electrical installation plus air and lubrication pipelines
Nine scissor lifts used during the overhead installation work
Installation of 28 manual assembly stations
Installation and integration of four robotic cells
Handling of a robot weighing more than 15,000 lb
Assembly tools mounted on 20-foot overhead steel structures
AGV routes integrated beneath the overhead equipment
Mechanical and electrical installation plus air and lubrication pipelines
Nine scissor lifts used during the overhead installation work
Installation of 28 manual assembly stations
Installation and integration of four robotic cells
Handling of a robot weighing more than 15,000 lb
Assembly tools mounted on 20-foot overhead steel structures
AGV routes integrated beneath the overhead equipment
Mechanical and electrical installation plus air and lubrication pipelines
Nine scissor lifts used during the overhead installation work
Installation of 28 manual assembly stations
Installation and integration of four robotic cells
Handling of a robot weighing more than 15,000 lb
Assembly tools mounted on 20-foot overhead steel structures
AGV routes integrated beneath the overhead equipment
Mechanical and electrical installation plus air and lubrication pipelines
Nine scissor lifts used during the overhead installation work
  • Installation of 28 manual assembly stations
  • Installation and integration of four robotic cells
  • Handling of a robot weighing more than 15,000 lb
  • Assembly tools mounted on 20-foot overhead steel structures
  • AGV routes integrated beneath the overhead equipment
  • Mechanical and electrical installation plus air and lubrication pipelines
  • Nine scissor lifts used during the overhead installation work

Integrated assembly system completed with no safety incidents

The project was completed with no safety incidents. Both the OEM and the end user were satisfied with the delivery and planned to collaborate with Beck & Pollitzer on future opportunities.

Manual stations
28
Robotic cells
4
Heavy robot
15,000+ lb
Specialist team
17

Need to know more?

How did the AGVs fit into the assembly system?
The AGVs transported engines between stations, navigating the floor beneath the 20-foot steel structures that carried the assembly tools.
Project Details
  • Client: Alternate-fuels technology manufacturer
  • Location: North Carolina, USA
  • Sector: Other Industries
  • Programme: Robotic cell and manual assembly line installation

Related Projects

Beck & Pollitzer Industrial Intelligence™

Industrial insight drawn from real-world delivery. Explore reports, articles and expert perspectives on the challenges shaping modern manufacturing and industrial programmes.
What manufacturers should consider before relocating production →
8 min

What manufacturers should consider before relocating production →

5 min read

What manufacturers should consider before relocating production →

5 min read

Your next project starts here

Whether you’re exploring an opportunity, planning a facility or preparing for installation,
our specialists can help you take the next step with confidence.
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.