Automated cold-store warehouse installation for a dairy producer

Installing three sets of warehouse steel structures for a -27°C automated warehouse, with less than 50 mm between the stacker crane and ceiling.

Russia

Installing an automated warehouse with less than 50 mm overhead clearance

The dairy producer required a fully automated warehouse system designed to operate at -27°C. The main installation constraint was the space above the stacker crane: at its highest point, less than 50 mm remained between the crane and the room ceiling.

The project therefore combined warehouse automation installation with a very tight positioning tolerance inside the cold-store structure.


Forty-five installation specialists supported by engineering and safety supervision

The site team comprised 45 installation specialists, two engineers and one safety engineer under the project manager. They installed three sets of steel structures for the warehouse complex, including automatic product loading and unloading systems.

With less than 50 mm between the highest point of the stacker crane and the ceiling, all work had to be carried out with pinpoint precision.

Installation of three sets of warehouse-complex steel structures
Automatic loading and unloading systems installed as part of the warehouse scope
45 installation specialists supported by two engineers and one safety engineer
Work carried out with less than 50 mm between the stacker crane and the ceiling
Installation of three sets of warehouse-complex steel structures
Automatic loading and unloading systems installed as part of the warehouse scope
45 installation specialists supported by two engineers and one safety engineer
Work carried out with less than 50 mm between the stacker crane and the ceiling
Installation of three sets of warehouse-complex steel structures
Automatic loading and unloading systems installed as part of the warehouse scope
45 installation specialists supported by two engineers and one safety engineer
Work carried out with less than 50 mm between the stacker crane and the ceiling
Installation of three sets of warehouse-complex steel structures
Automatic loading and unloading systems installed as part of the warehouse scope
45 installation specialists supported by two engineers and one safety engineer
Work carried out with less than 50 mm between the stacker crane and the ceiling
  • Installation of three sets of warehouse-complex steel structures
  • Automatic loading and unloading systems installed as part of the warehouse scope
  • 45 installation specialists supported by two engineers and one safety engineer
  • Work carried out with less than 50 mm between the stacker crane and the ceiling

Automated warehouse installation completed on time

The automated warehouse project was completed on time. The installed system was designed for operation at -27°C.

Steel structures installed
3 sets
Installation team
45 specialists + 3 engineering/safety staff
Crane-to-ceiling clearance
<50 mm
Operating temperature
-27°C
Project Details
  • Client: Dairy producer
  • Location: Russia
  • Sector: Warehouse Automation; Consumer Goods
  • Programme: Automated warehouse installation

Related Projects

Beck & Pollitzer Industrial Intelligence™

Industrial insight drawn from real-world delivery. Explore reports, articles and expert perspectives on the challenges shaping modern manufacturing and industrial programmes.
What manufacturers should consider before relocating production →
8 min

What manufacturers should consider before relocating production →

5 min read

What manufacturers should consider before relocating production →

5 min read

Your next project starts here

Whether you’re exploring an opportunity, planning a facility or preparing for installation,
our specialists can help you take the next step with confidence.
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.