Automated warehouse installation in southern Florida

Installing automated equipment with limited space for staging and pre-assembly
The warehouse automation project had restricted space available for staging materials and pre-assembling components. The team therefore had to adapt the installation approach to work within the reduced area.
Installation sequencing was adapted to suit the reduced staging area
The warehouse automation team developed a site approach that allowed machinery and components to be installed despite the limited staging and pre-assembly space.
The work was carried out under the project health and safety requirements.
Automated warehouse project progressed two weeks ahead of schedule
The automated warehouse system was successfully completed, with the project progressing two weeks ahead of schedule.
- Client: Supply-chain optimisation company
- Location: Southern Florida, USA
- Sector: Warehouse Automation
- Programme: Automated warehouse system installation
- Timeline: Completed; two weeks ahead of schedule

Bespoke customer fulfilment centre installation in Japan
- Chiba City, Japan Location
- First CFC of its kind in Asia Pacific Region

Autostore installation for a clothing distribution centre in North Carolina
- 1,444 Grid cells
- 36 Robots
- service + overhang mezzanines Systems

Automated cold-store warehouse installation for a dairy producer
- 3 sets Steel structures installed
- 45 specialists + 3 engineering/safety staff Installation team
- <50 mm Crane-to-ceiling clearance

AS/RS installation with 19 aisle cranes in Ohio
- 19 Aisle cranes
- cranes + pallet conveyors Main systems
- zero reported incidents/accidents Safety outcome

Warehouse automation installations across four tyre-manufacturing sites
- 200,000+ Project hours
- 4 Client locations
- 2 Countries

AutoStore installation for an online food retailer in Texas
- AutoStore + conveyor infrastructure Systems
- conveyor delivery delay Constraint
- AutoStore work reprioritised Programme response

Automated warehouse capacity expansion in Germany
- 80 Sorting stations installed
- 350+ Autonomous robots inducted
- 30 Vehicles unloaded

Electrical controls installation for an automated warehouse in Warrington
- 20 PLC cabinets
- 88 miles Control cable
- 6,500 m conveyor + 1,800 m shuttle Containment