Installing 7-, 8- and 10-inch extrusion presses, conveyors, ASRS and finishing systems with electrical and piping utilities across a planned 12-month programme.

Integrating extrusion presses, handling, automated storage and finishing equipment in one programme
The aluminium producer‘s installation programme covered three extrusion presses in 7-, 8- and 10-inch sizes, together with handling conveyors, an automated storage and retrieval system, anodising equipment and vertical powder-coating stations.
The scope also included electrical and piping utility installation through to « Power On ».
Machinery, conveyors, ASRS, finishing stations and utilities installed as one scope
Beck & Pollitzer India was assigned the installation of the extrusion presses and associated handling systems, plus the ASRS and finishing equipment. The team was also responsible for electrical and piping utilities up to the « Power On » stage.
The planned programme involved more than 150 skilled people and approximately 380,000 project hours from July 2022 to May 2023.
Installation of 7-, 8- and 10-inch extrusion presses |
Conveyor-based handling systems |
Automated storage and retrieval system installation |
Anodising and vertical powder-coating stations |
Electrical and piping utilities through to « Power On » |
Planned workforce of more than 150 people |
Installation of 7-, 8- and 10-inch extrusion presses |
Conveyor-based handling systems |
Automated storage and retrieval system installation |
Anodising and vertical powder-coating stations |
Electrical and piping utilities through to « Power On » |
Planned workforce of more than 150 people |
-
Installation of 7-, 8- and 10-inch extrusion presses
-
Conveyor-based handling systems
-
Automated storage and retrieval system installation
-
Anodising and vertical powder-coating stations
-
Electrical and piping utilities through to « Power On »
-
Planned workforce of more than 150 people
Planned 12-month installation programme
The programme was scheduled from July 2022 to May 2023, with more than 150 people and approximately 380,000 project hours planned.
- Client: Aluminium producer
- Location: India
- Sector: Metals
- Programme: Extrusion press, handling and ASRS installation
- Timeline: Started July 2022; planned completion May 2023

Aluminium slab casting equipment installation in Belgium
- 40,000+ Project hours
- Lichtervelde, Belgium Location
- Metals & Minerals Sector

Greenfield aluminium plant installation in Kathua, Jammu
- 610 days Programme length
- 230 + 25 supervisors Workforce
- 1,400 tonnes Mill capacity

Mechanical installation for a new cold rolling mill and finishing line
- 6,250+ tonnes Equipment installed
- 375 km Electrical cabling
- 30 microns Baseplate alignment tolerance

Main ram housing replacement on a 5,100-ton extrusion press
- 5,100 tons Extrusion press rating
- 400 tons Gantry capacity
- 17 Team size

4,400-ton extrusion press installation in the Southwest USA
- 4,400 tons Press
- 400 tons Gantry
- R120 forklift + hydraulic press cart Equipment

Production line relocation from Bulgaria to the Netherlands
- 2 Production lines
- furnaces + casting lines + transformers + cooling towers + pumps Main equipment
- cross-Europe Transport

HSE consultancy support for a major EV manufacturing facility in Saudi Arabia
- 10 months Programme length
- 100+ RAMS reviewed
- 500+ Observations closed

Automated tyre plant installation in Tangier, Morocco
- 70,560 Planned project hours
- 120 days Duration
- multiple Plant zones
Beck & Pollitzer Industrial Intelligence™