Assembling three grain silos to a 28-metre installation height using more than 80,000 screws, a 30-ton mobile crane and a 20-person delivery team.

Assembling 28-metre silos despite mismatched entry points, missing parts and changing site conditions
Our Hungarian team delivered the turnkey installation of three agricultural grain silos to an installation height of 28 metres. The team encountered mismatched entry points, missing parts, unpredictable weather and challenging site conditions during the machinery and equipment installation.
Twenty-person team using a 30-ton mobile crane, 4-ton telehandler and 80,000+ fixings
A 20-person team comprising engineers, fitters, management, site supervisors and Health & Safety supervisors delivered the turnkey installation. A 30-ton mobile crane and 4-ton telehandler supported the assembly work, while more than 80,000 screws were used to secure the silo components. The team adapted to the missing parts, entry-point mismatches and weather conditions as the work progressed.
Installation of three agricultural grain silos |
Assembly work carried out to a height of 28 metres |
More than 80,000 screws used to fasten the components |
30-ton mobile crane and 4-ton telehandler deployed |
Twenty-person multidisciplinary project team |
Installation adjusted around mismatched entry points, missing parts and changing weather |
Installation of three agricultural grain silos |
Assembly work carried out to a height of 28 metres |
More than 80,000 screws used to fasten the components |
30-ton mobile crane and 4-ton telehandler deployed |
Twenty-person multidisciplinary project team |
Installation adjusted around mismatched entry points, missing parts and changing weather |
-
Installation of three agricultural grain silos
-
Assembly work carried out to a height of 28 metres
-
More than 80,000 screws used to fasten the components
-
30-ton mobile crane and 4-ton telehandler deployed
-
Twenty-person multidisciplinary project team
-
Installation adjusted around mismatched entry points, missing parts and changing weather
Three grain silos completed on time
The turnkey installation was completed on time, and the client expressed a wish to continue the working relationship after the project.
Need to know more?
- Location: Hungary
- Sector: Consumer Goods
- Programme: Turnkey grain silo installation

Turnkey hygiene production line installation in France
- 4,500 Project hours
- 2 months Duration
- 232 Containers unloaded

Complex production tank rigging & installation in Poland
- 40 Project hours
- 1 day Duration
- 4 Team size

Coffee roasting plant installation and assembly in Sweden
- 20 On-site specialists
- 1 year Planned programme duration
- Järfälla, Sweden Location

Mechanical and electrical canning line installation in a live plant
- 79 Operatives
- ~60 tons Power and control cable
- ~15 tons Cable routes

Autostore installation for a clothing distribution centre in North Carolina
- 1,444 Grid cells
- 36 Robots
- service + overhang mezzanines Systems

Automated cold-store warehouse installation for a dairy producer
- 3 sets Steel structures installed
- 45 specialists + 3 engineering/safety staff Installation team
- <50 mm Crane-to-ceiling clearance

AS/RS installation with 19 aisle cranes in Ohio
- 19 Aisle cranes
- cranes + pallet conveyors Main systems
- zero reported incidents/accidents Safety outcome

AutoStore installation for an online food retailer in Texas
- AutoStore + conveyor infrastructure Systems
- conveyor delivery delay Constraint
- AutoStore work reprioritised Programme response