Production line installation for a food manufacturer in India

Moving heavy equipment between floors while fabricating a 110-tonne platform and silo
The project combined heavy machinery handling with fabrication and utility work. A principal challenge was shifting the air handling unit to the third floor of the building while the team also installed and fabricated a silo and a 110-tonne SS304 platform.
More than 90 personnel supported machinery moving, fabrication and pipework
The production line installation included unloading, shifting and installing machinery, together with fabrication and installation of SS304 interconnecting pipework, SS304 and mild-steel platform structures, insulation and polycarbonate sheeting.
All works completed within the agreed timeframe
The machinery shifting, fabrication and installation activities were completed within the agreed timeframe.
- Client: International food manufacturer
- Location: India
- Sector: Consumer Goods
- Programme: Production line installation and fabrication
- Timeline: Completed within the agreed timeframe

Turnkey hygiene production line installation in France
- 4,500 Project hours
- 2 months Duration
- 232 Containers unloaded

Complex production tank rigging & installation in Poland
- 40 Project hours
- 1 day Duration
- 4 Team size

Coffee roasting plant installation and assembly in Sweden
- 20 On-site specialists
- 1 year Planned programme duration
- Järfälla, Sweden Location

Mechanical and electrical canning line installation in a live plant
- 79 Operatives
- ~60 tons Power and control cable
- ~15 tons Cable routes

Installation of three 28-metre agricultural grain silos in Hungary
- 3 Silos installed
- 28 m Installation height
- 80,000+ Screws used

Autostore installation for a clothing distribution centre in North Carolina
- 1,444 Grid cells
- 36 Robots
- service + overhang mezzanines Systems

Automated cold-store warehouse installation for a dairy producer
- 3 sets Steel structures installed
- 45 specialists + 3 engineering/safety staff Installation team
- <50 mm Crane-to-ceiling clearance

AS/RS installation with 19 aisle cranes in Ohio
- 19 Aisle cranes
- cranes + pallet conveyors Main systems
- zero reported incidents/accidents Safety outcome
Beck & Pollitzer Industrial Intelligence™