A programme to relocate fully automated stamping and bending systems in Germany as general contractor, with each move aligned to production capacity.

Moving complete automated stamping units in line with production capacity
Our team in Germany began relocating a large number of fully automated stamping machines for an international automotive supplier specialising in autonomous driving technologies. Each press, with its stamping and bending tools, forms the core of a highly automated production unit that also includes oil mist separators, decoiling units, double feeders, laser stations, camera inspection systems, recoiling units with intermediate storage dispensers and noise protection enclosures.
General contractor responsibility through to commissioning
The project assigned Beck & Pollitzer general contractor responsibility for the full industrial relocation up to commissioning. The specialist assembly team used special manufacturer equipment for the relocation of the presses, with a project manager and assembly supervisor typically working with a team of ten skilled workers.
Each relocation step was planned weekly with the client and aligned with their production capacity requirements.
Relocation of fully automated stamping machines and their ancillary equipment |
Special manufacturer equipment used for the press relocations |
Weekly planning with the client, aligned to production capacity |
General contractor responsibility through to commissioning |
Relocation of fully automated stamping machines and their ancillary equipment |
Special manufacturer equipment used for the press relocations |
Weekly planning with the client, aligned to production capacity |
General contractor responsibility through to commissioning |
-
Relocation of fully automated stamping machines and their ancillary equipment
-
Special manufacturer equipment used for the press relocations
-
Weekly planning with the client, aligned to production capacity
-
General contractor responsibility through to commissioning
Planned through to the end of 2024
The project began in March 2024 and was planned to continue until the end of that year, with all stamping machines being relocated near Beck & Pollitzer’s headquarters in Germany.
Need to know more?
- Client: Automotive technology supplier
- Location: Germany
- Sector: Automotive
- Programme: Automated stamping machine relocation
- Timeline: Started March 2024; planned to run until the end of 2024

Cylinder head and block production line relocation: Poland to Brazil
- 50,000 Working hours
- 337 Trucks dispatched
- 2 Production lines relocated

Fuel injection pump production line move: Germany to Czech Republic
- 2 Production lines
- 30 Trucks
- 3-ton Forklifts

Five-week relocation of a 180-tonne extrusion line in Australia
- 180 tonnes Line weight
- 130 tonnes Main press
- 27 x 40 ft Containers

Relocation of 31 machines across four automotive halls in Hungary
- 31 Machines relocated
- 4 Industrial halls
- 2,000+ m² Area

Staged automotive machinery relocation from Germany to Hungary
- 3,000 Project hours
- 10 Relocation stages
- mechanical + electrical + transport Scope

Mild-hybrid underbody line installation for an automotive manufacturer
- 2,100 Project hours
- 13 operatives Team
- no reported incidents or accidents Safety outcome

Heavy machinery relocation from Poland to India in three shipping batches
- ~80 tonnes Total equipment weight
- ~8-10 tonnes Individual machines
- 3 Shipping batches

Machinery relocation from Hungary to Slovakia
- 5 weeks Timeline
- 2 Countries
- COVID restrictions + strict schedule Constraints