Relocating, integrating and reinstalling robots, fixtures, cabinets and associated equipment across 2,100 project hours in France.

Relocating and integrating a mixed package of robotic underbody-line equipment
The mild-hybrid underbody-line project required equipment to be electrically and mechanically dismantled before relocation, integration and reinstallation.
The scope covered fences, sealer pumps, welding and controller cabinets, cable trays, robot pedestals, robots, track motions, grippers, guns, fixtures, turntables and hammer stations.
Reinstallation supported by floor fixing, labelling, hose reconnection and formal lifting controls
A 13-person team delivered 2,100 project hours across the project. Reinstallation included drilling and fixing floor plates, labelling and removal and reconnection of hoses.
Project management, site supervision and Quality, Health and Safety supervision were part of the team structure. Quality checks, lifting plans, detailed method statements and risk assessments supported the work.
Mechanical and electrical dismantling of the underbody-line equipment |
Relocation and reinstallation of robots, fixtures, cabinets and associated systems |
Floor-plate drilling and fixing |
Labelling plus hose removal and reconnection |
Quality checks, lifting plans, method statements and risk assessments |
Project management, site and QH&S supervision |
Mechanical and electrical dismantling of the underbody-line equipment |
Relocation and reinstallation of robots, fixtures, cabinets and associated systems |
Floor-plate drilling and fixing |
Labelling plus hose removal and reconnection |
Quality checks, lifting plans, method statements and risk assessments |
Project management, site and QH&S supervision |
-
Mechanical and electrical dismantling of the underbody-line equipment
-
Relocation and reinstallation of robots, fixtures, cabinets and associated systems
-
Floor-plate drilling and fixing
-
Labelling plus hose removal and reconnection
-
Quality checks, lifting plans, method statements and risk assessments
-
Project management, site and QH&S supervision
Underbody line installation completed on time with no reported incidents or accidents
The work was completed on time across 2,100 project hours with no reported incidents or accidents.
- Client: Multinational automotive manufacturer
- Location: France
- Sector: Automotive
- Programme: MHEV underbody line relocation and installation

Cylinder head and block production line relocation: Poland to Brazil
- 50,000 Working hours
- 337 Trucks dispatched
- 2 Production lines relocated

Fuel injection pump production line move: Germany to Czech Republic
- 2 Production lines
- 30 Trucks
- 3-ton Forklifts

Automated stamping machine relocation for an automotive technology supplier
- project manager, assembly supervisor and around 10 skilled workers Core team
- relocation through to commissioning Scope
- weekly with the client Planning

Five-week relocation of a 180-tonne extrusion line in Australia
- 180 tonnes Line weight
- 130 tonnes Main press
- 27 x 40 ft Containers

Relocation of 31 machines across four automotive halls in Hungary
- 31 Machines relocated
- 4 Industrial halls
- 2,000+ m² Area

Staged automotive machinery relocation from Germany to Hungary
- 3,000 Project hours
- 10 Relocation stages
- mechanical + electrical + transport Scope

Heavy machinery relocation from Poland to India in three shipping batches
- ~80 tonnes Total equipment weight
- ~8-10 tonnes Individual machines
- 3 Shipping batches

Machinery relocation from Hungary to Slovakia
- 5 weeks Timeline
- 2 Countries
- COVID restrictions + strict schedule Constraints