Moving two fuel injection pump production lines from Munich to České Budějovice using 30 trucks over 11 weeks.

Match-marking two production lines for accurate reassembly
Two fuel injection pump production lines had to be moved from a facility in Munich, Germany, to a production site in České Budějovice, Czech Republic. The main challenge was the precise match-marking of both mechanical and electrical components, which was crucial for the reassembly and functionality of the lines at their new location.
Dismantling, packaging and a 30-truck transport programme
The scope covered the complete dismantling, packaging and transportation of both production lines, followed by their reinstallation at the new location. Thirty trucks were used for the transport, each loaded and offloaded using 3-ton forklifts.
The 11-week programme ran from July to September 2023, supported by detailed planning and coordination across the team.
Mechanical and electrical match-marking before dismantling |
Complete dismantling and packaging of both production lines |
Thirty-truck transport programme between Germany and the Czech Republic |
Reinstallation at the new production site |
Mechanical and electrical match-marking before dismantling |
Complete dismantling and packaging of both production lines |
Thirty-truck transport programme between Germany and the Czech Republic |
Reinstallation at the new production site |
-
Mechanical and electrical match-marking before dismantling
-
Complete dismantling and packaging of both production lines
-
Thirty-truck transport programme between Germany and the Czech Republic
-
Reinstallation at the new production site
Two production lines relocated safely and on time
The relocation was completed safely, on time and in full compliance with quality standards over 11 weeks, with match-marking supporting accurate reassembly at the receiving site.
Need to know more?
- Location: Munich, Germany to České Budějovice, Czech Republic
- Sector: Automotive
- Programme: International production line move
- Timeline: 11 weeks (July to September 2023)

Cylinder head and block production line relocation: Poland to Brazil
- 50,000 Working hours
- 337 Trucks dispatched
- 2 Production lines relocated

Automated stamping machine relocation for an automotive technology supplier
- project manager, assembly supervisor and around 10 skilled workers Core team
- relocation through to commissioning Scope
- weekly with the client Planning

Five-week relocation of a 180-tonne extrusion line in Australia
- 180 tonnes Line weight
- 130 tonnes Main press
- 27 x 40 ft Containers

Relocation of 31 machines across four automotive halls in Hungary
- 31 Machines relocated
- 4 Industrial halls
- 2,000+ m² Area

Staged automotive machinery relocation from Germany to Hungary
- 3,000 Project hours
- 10 Relocation stages
- mechanical + electrical + transport Scope

Mild-hybrid underbody line installation for an automotive manufacturer
- 2,100 Project hours
- 13 operatives Team
- no reported incidents or accidents Safety outcome

Heavy machinery relocation from Poland to India in three shipping batches
- ~80 tonnes Total equipment weight
- ~8-10 tonnes Individual machines
- 3 Shipping batches

Machinery relocation from Hungary to Slovakia
- 5 weeks Timeline
- 2 Countries
- COVID restrictions + strict schedule Constraints