Relocating and reassembling washing-machine drum production lines within an Italian plant, supported by teams from Italy and the Czech Republic.

Moving existing drum-production lines to another area of the same plant
The white-goods manufacturer required washing-machine drum production lines to be moved and reassembled in another production area within its plant near Milan.
The programme involved teams from Italy and the Czech Republic working together across the internal move.
Logistics, equipment, documentation and local-supplier management
The Italy and Czech teams supported the relocation across logistics, equipment, documentation and local-supplier management. The existing assembly lines were moved within the plant and reassembled in the new production area.
Internal relocation of washing-machine drum production lines |
Reassembly in another production area |
Logistics and equipment coordination |
Project documentation and local-supplier management |
Cross-border team support from Italy and the Czech Republic |
Internal relocation of washing-machine drum production lines |
Reassembly in another production area |
Logistics and equipment coordination |
Project documentation and local-supplier management |
Cross-border team support from Italy and the Czech Republic |
-
Internal relocation of washing-machine drum production lines
-
Reassembly in another production area
-
Logistics and equipment coordination
-
Project documentation and local-supplier management
-
Cross-border team support from Italy and the Czech Republic
Drum-production lines relocated and reassembled within the plant
The internal relocation was completed, with the existing washing-machine drum lines moved and reassembled in a different production area of the Italian facility.
- Client: White-goods manufacturer
- Location: Near Milan, Italy
- Sector: Consumer Goods
- Programme: Internal production line relocation

Cosmetic bottling line relocation: Ohio to Texas
- 42 Components relocated
- 13,000+ lbs Heaviest component
- 4 weeks Timeline

Refrigerator production line relocation: Hungary to Egypt
- 250+ Machines assembled
- 2 Countries
- 3 Teams collaborating

Four-line white goods production relocation across Europe
- 4 Production lines
- Germany Origin
- Belgium + Poland + Spain Destinations

Hygiene and medical production line relocation in the Tula region
- 2 sites Relocation
- mechanical + electrical dismantling and reassembly Scope
- compressed air + fire suppression Utilities

Turnkey hygiene production line installation in France
- 4,500 Project hours
- 2 months Duration
- 232 Containers unloaded

Complex production tank rigging & installation in Poland
- 40 Project hours
- 1 day Duration
- 4 Team size

Coffee roasting plant installation and assembly in Sweden
- 20 On-site specialists
- 1 year Planned programme duration
- Järfälla, Sweden Location

Mechanical and electrical canning line installation in a live plant
- 79 Operatives
- ~60 tons Power and control cable
- ~15 tons Cable routes