Relocating refrigerator production lines from Hungary to Egypt and reassembling more than 250 machines.

Relocating an entire refrigerator production line across two countries
Our teams in Poland, Hungary and Turkey relocated refrigerator production lines from Hungary to Egypt for a household appliance manufacturer. The project ran in two stages: disassembly and overseas transport from Hungary, followed by the assembly of more than 250 machines in Egypt using only the client’s resources.
A pre-relocation 3D scan, followed by full disassembly, transport and reassembly of 250+ machines
Before the relocation of the machines began, our team carried out a 3D scan of the entire plant in Hungary, a tool that proved essential for accurately reassembling the machines in Egypt. Our team took full responsibility for the Hungary-side work, from mechanical, electrical and piping disassembly through to packing and loading for overseas transport. In Egypt, our engineers supervised the mechanical assembly of more than 250 machines, using the client’s own resources, workforce and tools.
3D scan of the entire Hungary plant, used to guide accurate reassembly in Egypt |
Mechanical, electrical and piping disassembly, followed by packing and loading for overseas transport |
Mechanical assembly, precise setting, electrical connections and start-up assistance for 250+ machines in Egypt |
Coordination of tool supply, heavy equipment and employee scheduling using the client’s resources |
Project management covering scope definition and subcontractor coordination throughout |
3D scan of the entire Hungary plant, used to guide accurate reassembly in Egypt |
Mechanical, electrical and piping disassembly, followed by packing and loading for overseas transport |
Mechanical assembly, precise setting, electrical connections and start-up assistance for 250+ machines in Egypt |
Coordination of tool supply, heavy equipment and employee scheduling using the client’s resources |
Project management covering scope definition and subcontractor coordination throughout |
-
3D scan of the entire Hungary plant, used to guide accurate reassembly in Egypt
-
Mechanical, electrical and piping disassembly, followed by packing and loading for overseas transport
-
Mechanical assembly, precise setting, electrical connections and start-up assistance for 250+ machines in Egypt
-
Coordination of tool supply, heavy equipment and employee scheduling using the client’s resources
-
Project management covering scope definition and subcontractor coordination throughout
250+ machines reassembled to local quality and safety standards
The project relocated the refrigerator production line from Hungary to Egypt and reassembled more than 250 machines, completed in accordance with local quality and safety standards.
Need to know more?
- Client: Household appliance manufacturer
- Location: Hungary → Egypt
- Sector: Consumer Goods
- Programme: International production line relocation

Cosmetic bottling line relocation: Ohio to Texas
- 42 Components relocated
- 13,000+ lbs Heaviest component
- 4 weeks Timeline

Internal washing-machine drum line relocation near Milan
- 2 Countries supporting delivery
- internal plant move Relocation type
- washing-machine drum production lines Equipment

Four-line white goods production relocation across Europe
- 4 Production lines
- Germany Origin
- Belgium + Poland + Spain Destinations

Hygiene and medical production line relocation in the Tula region
- 2 sites Relocation
- mechanical + electrical dismantling and reassembly Scope
- compressed air + fire suppression Utilities

Turnkey hygiene production line installation in France
- 4,500 Project hours
- 2 months Duration
- 232 Containers unloaded

Complex production tank rigging & installation in Poland
- 40 Project hours
- 1 day Duration
- 4 Team size

Coffee roasting plant installation and assembly in Sweden
- 20 On-site specialists
- 1 year Planned programme duration
- Järfälla, Sweden Location

Mechanical and electrical canning line installation in a live plant
- 79 Operatives
- ~60 tons Power and control cable
- ~15 tons Cable routes