Relocating four white goods production lines from Germany to Belgium, Poland and Spain, including dismantling, transport, loading, unloading and reinstallation.

Moving four production lines across several countries against a fixed client schedule
A white goods manufacturer required four production lines to be transferred from Germany to three destinations in Belgium, Poland and Spain. Each line had to be disconnected, loaded, transported, unloaded and reinstalled while the programme remained aligned to the client’s required schedule.
Multi-country relocation managed by the Beck & Pollitzer France team
The international factory relocation covered dismantling, transportation and installation across four countries. Forklifts, cherry pickers and cranes were used during disconnection, loading and unloading, while standardised working processes supported delivery across the different sites.
The project was coordinated across the origin and destination sites to maintain consistent execution through each stage of the transfer.
Four production lines transferred to Belgium, Poland and Spain
The four production lines were relocated within the client’s required schedule, with production downtime kept to a minimum during the transfer.
- Client: White goods manufacturer
- Location: Germany to Belgium, Poland and Spain
- Sector: Consumer Goods
- Programme: International production line relocation
- Timeline: Completed to client schedule

Cosmetic bottling line relocation: Ohio to Texas
- 42 Components relocated
- 13,000+ lbs Heaviest component
- 4 weeks Timeline

Refrigerator production line relocation: Hungary to Egypt
- 250+ Machines assembled
- 2 Countries
- 3 Teams collaborating

Internal washing-machine drum line relocation near Milan
- 2 Countries supporting delivery
- internal plant move Relocation type
- washing-machine drum production lines Equipment

Hygiene and medical production line relocation in the Tula region
- 2 sites Relocation
- mechanical + electrical dismantling and reassembly Scope
- compressed air + fire suppression Utilities

Turnkey hygiene production line installation in France
- 4,500 Project hours
- 2 months Duration
- 232 Containers unloaded

Complex production tank rigging & installation in Poland
- 40 Project hours
- 1 day Duration
- 4 Team size

Coffee roasting plant installation and assembly in Sweden
- 20 On-site specialists
- 1 year Planned programme duration
- Järfälla, Sweden Location

Mechanical and electrical canning line installation in a live plant
- 79 Operatives
- ~60 tons Power and control cable
- ~15 tons Cable routes
Beck & Pollitzer Industrial Intelligence™