Transporting equipment from the Netherlands to Belgium, followed by mechanical installation, laser alignment and site supervision across multiple zones.

The Challenge
Coordinating cross-border transport with installation activities across several production zones
The commercial-vehicle project required equipment to be moved from Breda in the Netherlands to Westerlo in Belgium and then installed across several site zones. The scope combined transport, mechanical work, alignment and site management.
Our Solution
French teams supplied labour, supervision, plant equipment and project management
The international relocation and installation included equipment transport, mechanical mounting and installation, laser-tracker alignment, and the installation of fences and doors.
Project management and site supervision were provided alongside dedicated health and safety oversight.
The Outcome
Truck cab manufacturing plant installed with no reported incidents or accidents
The project was completed successfully with no reported incidents or accidents during the works.
- Client: Major commercial vehicle manufacturer
- Location: Breda, Netherlands to Westerlo, Belgium
- Sector: Automotive
- Programme: International relocation and truck cab plant installation
- Timeline: Completed

Vulcanisation press relocation from Tunisia to the Czech Republic
- 450 Project hours
- 30 days Duration
- 2 Countries

Cylinder head and block production line relocation: Poland to Brazil
- 50,000 Working hours
- 337 Trucks dispatched
- 2 Production lines relocated

Fuel injection pump production line move: Germany to Czech Republic
- 2 Production lines
- 30 Trucks
- 3-ton Forklifts

Automated stamping machine relocation for an automotive technology supplier
- project manager, assembly supervisor and around 10 skilled workers Core team
- relocation through to commissioning Scope
- weekly with the client Planning

Five-week relocation of a 180-tonne extrusion line in Australia
- 180 tonnes Line weight
- 130 tonnes Main press
- 27 x 40 ft Containers

Relocation of 31 machines across four automotive halls in Hungary
- 31 Machines relocated
- 4 Industrial halls
- 2,000+ m² Area

Staged automotive machinery relocation from Germany to Hungary
- 3,000 Project hours
- 10 Relocation stages
- mechanical + electrical + transport Scope

Mild-hybrid underbody line installation for an automotive manufacturer
- 2,100 Project hours
- 13 operatives Team
- no reported incidents or accidents Safety outcome