A guide to safely moving industrial machinery

A complete guide for safe machinery and equipment move

Moving heavy machinery, sometimes called machine shifting, requires a defined sequence covering assessment, dismantling, lifting, transport, reassembly and testing. The exact method depends on the machine, the route, the site and whether production continues around the work.

How do you move heavy machinery safely?

A safe machinery move follows a planned sequence: assess the equipment and route, define the lifting and transport method, dismantle and protect the machine, rig and move it, transport it where required, reassemble and align it, then complete inspection and testing before production restarts.

The International Labour Organization estimates that 395 million workers worldwide sustain a non-fatal work injury each year. A heavy machinery move combines lifting, stored energy, moving vehicles, suspended loads and changing work zones, so hazards and controls should be agreed before work begins and reviewed as site conditions change.

1. Complete a pre-move assessment

Record the machine dimensions, weight, centre of gravity, lifting points and any manufacturer instructions. Check the route from the existing position to the loading area and from delivery point to final position, including floor loading, door openings, turning space, overhead restrictions and access for lifting equipment.

2. Build the moving plan

Define responsibilities, sequence the move and identify the equipment, labour and permits required. The plan should include electrical, hydraulic and pneumatic isolation; dismantling; packing; lifting; transport; unloading; reassembly and testing.

Transport and lifting requirements vary by country, so the move must be checked against the rules that apply at the origin site, the destination site and along the transport route. Cross-border projects may also need customs clearance, escorts, permits or route approvals, depending on the machinery and journey.

3. Dismantle and protect the machinery

Follow the manufacturer’s instructions and record the machine condition before work starts. Match-mark components, photograph connections and isolate electrical, hydraulic and pneumatic systems. Sensitive assemblies may need separate crates, shock protection, moisture control or other packaging selected for the equipment and journey.

4. Plan and execute the rigging

Select lifting equipment and rigging hardware from the verified load data and site conditions. The method may involve cranes, forklifts, gantries, skates, jacks or combinations of these systems.

For a deeper explanation of load handling and positioning, see our guide to rigging services and riggers.

5. Transport the machinery

Use a transport provider and vehicle configuration suitable for the loaded weight and dimensions. Route surveys may be required for bridge capacity, road width, overhead restrictions, street furniture and delivery access. The transport plan should also account for the receiving site’s unloading sequence so lifting equipment and installation teams are ready when the load arrives.

6. Unload, position and reassemble

Unload onto a prepared route and move the machine into its final position using the approved lifting or movement method. Reassemble components from the match-marking records, reconnect services and complete mechanical checks before energisation.

Where positional tolerances are tight, precision measurement and alignment can support floor marking, levelling and verification.

Reinstallation at the new position follows the same stages as machinery installation: assembly, alignment, connection and testing.

7. Test and hand over

Inspect the machinery for transport or handling damage, verify guards and connections, and complete the required mechanical, electrical and functional checks. Any issue identified during inspection should be documented, assessed and resolved before the machine is returned to production.

A machinery-relocation example

For a relocation from Germany to Trutnov in the Czech Republic, Beck & Pollitzer unloaded and moved production equipment to a fourth-floor installation area. The seven-person team worked from risk assessments, method statements and lifting plans, using 5-tonne forklifts and two 55-tonne mobile cranes. The work took 528 project hours.

The same end-to-end scope can cover machine relocation from dismantling through reinstallation, with lifting, transport and installation planned as one work package.

Medical Equipment Relocation

Medical equipment movers: Engineering-led relocation for sensitive medical assets

Hospitals, laboratories and pharmaceutical manufacturers move equipment when departments expand, facilities are rebuilt or production transfers to a new site. For sensitive medical assets, the move has to protect the equipment, its calibration and cleanliness, and the services that depend on it.

Why does moving medical equipment need specialist engineering?

Medical and laboratory equipment combines sensitive electronics, calibrated sensors and vibration-sensitive components with strict installation tolerances. A diagnostic scanner, an analytical instrument or a pharmaceutical production line may also be heavy, difficult to access and subject to manufacturer and regulatory requirements before it can return to service.

Specialist medical equipment movers plan each move around those constraints: the route, the lifting method, protection during transport, and the alignment and checks needed at the new location.

What equipment do medical equipment movers handle?

  • Medical imaging systems: MRI, CT and PET scanners, which combine heavy components with sensitive alignment requirements.
  • Therapy systems: linear accelerators, cyclotrons and proton therapy equipment.
  • Laboratory and diagnostic equipment: analytical instruments, testing equipment and scientific apparatus.
  • Pharmaceutical production equipment: fill-finish, inspection and packaging lines, autoclaves, lyophilisers and isolators.

Beck & Pollitzer relocates and installs equipment across all four areas, including MRI systems, as part of its life sciences and pharmaceutical work.

The medical equipment relocation process

1. Technical survey

A pre-move engineering survey checks floor loading, transit dimensions, access routes and the electrical and utility requirements at both locations. Manufacturer requirements for decommissioning, transport and recommissioning are confirmed at this stage.

2. Asset tagging and traceability

High-value components, fragile peripherals and connections are mapped and tagged so every part can be traced through the move and returned to the right position during reinstallation.

3. Rigging and transport

Lifting plans are prepared for each heavy or sensitive item, in line with the lifting regulations that apply where the work takes place. Transport is chosen to suit the equipment, including vibration-controlled vehicles where the manufacturer requires them. Heavy items such as scanners often have to pass through tight internal routes or be lifted through openings in the building.

4. Reinstallation and alignment

At the new location, the equipment is positioned, levelled and reconnected to its utilities. Where geometry and calibration are critical, precision measurement and alignment verify its position before the manufacturer or the client’s team completes recommissioning and validation.

Working in regulated and cleanroom environments

In pharmaceutical facilities and laboratories, the move has to respect the site’s contamination controls. This may include clean-build procedures, non-marking lifting equipment, controlled access zones and site-specific gowning requirements, depending on the cleanroom classification and facility procedures.

Where production is regulated under GMP or GDP, the move also needs documentation that supports traceability and audit-ready handover. Beck & Pollitzer teams work to each site’s procedures and coordinate closely with equipment manufacturers throughout.

Medical and lab equipment relocation checklist

  • Inventory: list every asset, including serial numbers and current calibration status.
  • Manufacturer coordination: confirm warranty requirements and any specialist decommissioning or recommissioning steps.
  • Utilities: identify power, gas, water and data requirements at the new site before the move.
  • Floor loading: confirm the new location can support heavy diagnostic or production equipment.
  • Contamination control: for cleanroom moves, agree clean-build procedures and gowning requirements.
  • Risk assessments and method statements: including plans for vibration control and fragile components.
  • Regulatory documentation: make sure activities are recorded for GMP or GDP requirements where they apply.
  • Contingency: agree downtime windows and backup arrangements for critical samples, data and services.

Large medical systems in practice

Some medical systems are as large as industrial machinery. On a proton beam therapy installation in Spain, Beck & Pollitzer handled more than 220 tonnes of equipment, using 400-tonne cranes to lift components in through the roof. The team also completed the mechanical, electrical and instrumentation integration and installed more than 40 km of cabling.

For individual assets and complete departments, medical equipment moves are delivered through Beck & Pollitzer’s machine relocation services.

Guide to Successfully Moving a Warehouse

Warehouse relocation services: a guide to minimising disruption

Warehouse relocation is the process of moving inventory, racking, equipment and systems from one facility to another while keeping fulfilment running throughout. Done well, it follows a phased, sequenced plan spread across multiple stages.

A warehouse relocation touches every part of daily operations, from inbound receiving and order fulfilment to the systems and people that keep them running. For the team responsible for that continuity, the risk comes from sequencing, safety and communication that aren’t planned together from the outset, more than from the move itself.

Drawing on more than 160 years of engineering and relocation experience, and 50M+ hours of installation work across industrial sites worldwide, here’s how we approach warehouse moves so operations stay on track.

Building the warehouse relocation plan

A warehouse relocation starts with programme alignment, not a moving date. Before committing to a timeline, assess current and future storage requirements against the new facility’s layout, capacity and access constraints, since a mismatch discovered mid-move is far more disruptive than one caught during planning. From there, build a detailed schedule covering equipment relocation and staff training alongside the milestones that connect them, and set a communication plan so customers, suppliers and staff know what to expect well ahead of moving day.

Preparing for a controlled warehouse move

Preparation determines how much of the move goes to plan. A full inventory audit and validation exercise, checking what exists against what’s recorded, prevents items being lost or misplaced in transit. Equipment, racking and stock should be clearly labelled and match-marked for efficient identification and reassembly at the new site, and sequencing should reflect operational priority rather than convenience.

Warehouse relocation checklist

A relocation checklist keeps the moving parts visible across a warehouse move of any scale:

  • New warehouse site readiness confirmed against layout and capacity requirements
  • Inventory audit and validation completed
  • Detailed sequencing and moving plan in place, covering equipment and staff training milestones
  • Customers and suppliers notified ahead of the move date
  • IT infrastructure and warehouse management system cutover planned
  • Utilities confirmed and connected at the new site
  • Staff trained on the new layout before go-live

A checklist only works if it reflects a sequencing plan built around your operation’s actual priorities, not a generic template.

Keeping safety at the centre of the move

Health and safety oversight sits inside relocation planning from the outset, not as a separate workstream added later. Rigging and dismantling of racking, conveyor and automated storage systems carries its own risk profile. Electrical isolation, lockout/tagout procedures, controlled lifting for oversized equipment and clear demarcation of active work zones all need agreeing before the first item moves, not improvised on the day. Our approach to health and safety is aligned to ISO 45001, and every relocation project carries dedicated oversight from mobilisation through to handover.

The risk this addresses is real: handling, lifting and carrying account for around 17% of all non-fatal workplace injuries in Great Britain, according to HSE injury data.

Minimising disruption during warehouse moves

Continuity depends on sequencing decisions made well before moving day. A phased relocation, scheduling around off-peak periods, and close coordination with warehouse management systems and IT infrastructure all reduce the risk of fulfilment gaps during warehouse moves of any size.

Warehouse relocation services from Beck & Pollitzer

Our machine relocation service covers the full scope of a warehouse move: packing and dismantling, transportation, and reinstallation, coordinated by one team from planning through to commissioning rather than handed between contractors along the way.

Once the relocation itself is complete, ongoing storage, layout and day-to-day operations sit with our logistics and warehousing service.

Project management and a single point of accountability

Multiple disciplines come together in any warehouse relocation: mechanical, electrical, IT and site logistics, often with several contractors and the client’s own operations team involved at once. Our project management approach keeps planning, scheduling and delivery under one point of accountability throughout, with interface management between trades built into the programme rather than left for the client to resolve mid-move.

Relocation experience that carries through to commissioning

This is the same discipline we’ve applied on complex, live-site relocations, including a recent expansion of an active, space-constrained warehouse that required coordinating a four-country team to install and commission 80 sorting stations and induct more than 350 autonomous robots, with most equipment moved, unpacked and installed within a single day. The same principle applies at any warehouse scale: one point of accountability, from the initial site assessment through to reinstallation and commissioning support.