Relocating an entire production cell from France to Morocco with zero production delays.

The Challenge
Moving a production cell between countries without a production gap
Our team in France relocated a complete production cell from France to Morocco for a glass manufacturer, as part of an ongoing relationship with the client. The move had to avoid any disruption to the client’s manufacturing operations, with dismantling, cross-border transport and reinstallation carried out under a strict timeline.
Our Solution
Dismantling, cross-border transport and recommissioning under one programme
Our team in France dismantled the production line at the original site, then coordinated secure cross-border transport of all equipment using four dedicated trucks. Our team in Morocco carried out the reinstallation, recommissioning and the PLC modifications needed to adapt the line to its new site, working alongside the France-based team throughout.
Dismantling of the production line at the original site in France |
Secure cross-border transport of all equipment using four dedicated trucks |
Full reinstallation and recommissioning of the production cell in Morocco |
PLC modifications to adapt the line’s control systems to its new site |
Coordination between our local team in Morocco and the France-based team throughout |
Dismantling of the production line at the original site in France |
Secure cross-border transport of all equipment using four dedicated trucks |
Full reinstallation and recommissioning of the production cell in Morocco |
PLC modifications to adapt the line’s control systems to its new site |
Coordination between our local team in Morocco and the France-based team throughout |
-
Dismantling of the production line at the original site in France
-
Secure cross-border transport of all equipment using four dedicated trucks
-
Full reinstallation and recommissioning of the production cell in Morocco
-
PLC modifications to adapt the line’s control systems to its new site
-
Coordination between our local team in Morocco and the France-based team throughout
The Outcome
Zero production delays, cross-border move completed to schedule
The production cell was relocated from France to Morocco with zero production delays. Coordination between the France and Morocco teams carried the same programme through dismantling, cross-border transport, reinstallation, PLC modification and recommissioning at the receiving site.
Need to know more?
- Client: Glass manufacturer
- Location: France → Morocco
- Sector: Building Products
- Programme: International production cell relocation

Production line relocation between sister facilities in North Carolina
- 20 pieces Equipment relocated
- 20,000+ lb Heaviest component
- 30 tons Forklift capacity

Production line relocation from Germany to the United Kingdom
- 2 Countries
- match-marking + disconnection + dismantling Origin scope
- press + equipment reinstallation Destination scope

Plywood and LVL production facility installation in France
- 12 months Programme length
- France Country
- Thébault Group Client

Overhead installation of a six-section curing oven system
- 6 Oven sections installed
- 30-40 tonnes each Section weight
- 500 tonnes Crane capacity

Vulcanisation press relocation from Tunisia to the Czech Republic
- 450 Project hours
- 30 days Duration
- 2 Countries

Technical rigging & retrofit: integrating a Gigafactory with more than 3,500 assets
- 29,467 Project hours
- 117 days Duration
- 3,506 Items relocated

Multi-floor relocation of fragile printing equipment for a pharmaceutical manufacturer
- 8 Machines relocated
- 500 kg Heaviest unit
- 5,000 x 800 x 1,100 mm Largest units

Relocation of two pharmaceutical autoclaves in freezing outdoor conditions
- 2,500 kg Autoclave 1
- 850 kg Autoclave 2
- -2°C with snowfall Delivery conditions