Ten-line welding shop installation for new vehicle production

The Challenge
Coordinating 160 robots across ten new welding lines for new vehicle models
The automotive client was introducing new vehicle models and required ten new UB and UG welding lines, comprising 160 robots and associated accessories. The main challenge was coordinating the installation of a large number of robots and integrating them with the existing production systems.
Our Solution
Thirty operatives deployed across mechanical installation, robot integration and final alignment
Our Czech team deployed 30 operatives over seven months to carry out the mechanical installation of the welding lines. Each component of the welding-shop equipment was positioned, levelled and anchored, and the 160 robots were integrated into the lines with their accessories. Detailed planning and execution allowed the team to manage the volume of robotic equipment.
Mechanical installation of 10 UB and UG welding lines |
Integration of 160 robots and associated accessories |
Positioning, levelling and anchoring of welding-shop equipment |
Thirty operatives deployed across the seven-month programme |
Integration with the client’s existing production systems |
Mechanical installation of 10 UB and UG welding lines |
Integration of 160 robots and associated accessories |
Positioning, levelling and anchoring of welding-shop equipment |
Thirty operatives deployed across the seven-month programme |
Integration with the client’s existing production systems |
-
Mechanical installation of 10 UB and UG welding lines
-
Integration of 160 robots and associated accessories
-
Positioning, levelling and anchoring of welding-shop equipment
-
Thirty operatives deployed across the seven-month programme
-
Integration with the client’s existing production systems
The Outcome
Ten welding lines installed to support production of new vehicle models
The welding-shop installation was completed after seven months, enabling the client to ramp up production of its new vehicle models without disruption.
Need to know more?
- Client: Automotive industry client
- Location: Czech Republic
- Sector: Automotive
- Programme: Welding shop mechanical installation
- Timeline: 7 months

HSE consultancy support for a major EV manufacturing facility in Saudi Arabia
- 10 months Programme length
- 100+ RAMS reviewed
- 500+ Observations closed

Automated tyre plant installation in Tangier, Morocco
- 70,560 Planned project hours
- 120 days Duration
- multiple Plant zones

Vulcanisation press relocation from Tunisia to the Czech Republic
- 450 Project hours
- 30 days Duration
- 2 Countries

Body shop installation for a new EV plant in India
- nearly 100 Containers unloaded
- 30 Trucks
- 50 Site team

Multi-scope automotive summer shutdown upgrade in Hungary
- 2 weeks Shutdown window
- 20 years of accumulation Legacy cabling removed
- precision levelling and MEWP access Key methods

Nine-robot replacement during an automotive summer shutdown
- 9 Robots replaced
- 20 Team size

Tyre manufacturing plant installation in Tangier, Morocco
- 70,000+ Project hours
- 8+ months Duration
- 5+ km Conveyor systems

24-tonne TEF 220 press installation in the Czech Republic
- 24 tonnes Press weight
- 10 hours Working day
- PT5400 Gantry
Beck & Pollitzer Industrial Intelligence™