Installing eight electrode production lines across three floors with a 120-person team, including a large anode dryer system in a confined area.

The Challenge
Installing eight electrode lines simultaneously across three floors of a busy Gigafactory
The project required process equipment for rechargeable-battery manufacturing to be installed across three plant floors while other contractors and trades were working around the same areas.
One of the key handling constraints was positioning a large anode dryer system within a confined installation area.
Our Solution
A 120-person installation team worked across three floors while coordinating shared work areas
The battery manufacturing installation covered eight complete electrode production lines, with the site team organising labour and resources around concurrent contractor activity.
The Outcome
Eight production lines installed with follow-on maintenance support
The installation work progressed safely and successfully, followed by maintenance support to the client.
- Client: Major EV and battery manufacturer
- Location: USA
- Sector: Battery and Electrification; Automotive
- Programme: Battery cell process equipment installation
- Timeline: Ongoing support programme in 2021

HSE consultancy support for a major EV manufacturing facility in Saudi Arabia
- 10 months Programme length
- 100+ RAMS reviewed
- 500+ Observations closed

Body shop installation for a new EV plant in India
- nearly 100 Containers unloaded
- 30 Trucks
- 50 Site team

EV manufacturing installation and process utility integration in India
- 10 months Programme duration
- 120 Site team
- 4 Towers erected

Battery cell plant electrical installation in France
- 45,000 Project hours
- 18 months Duration
- electrical integration and installation Scope

Body-in-white installation for an electric vehicle programme
- body sides + final hang-on line + roller tables + lift systems Scope
- compressed design-to-build schedule Constraint

Scalable M&E installation: Automated storage & handling for a US battery facility
- 111,328 Project hours
- 15 months Programme length
- 100 Peak workforce

Voltage regulator production facility installation in the USA
- 275 Machines installed
- 250,000 sq ft Facility size
- 8 months Programme duration

Solar glass manufacturing line installation at a renewable energy gigafactory in India
- 6,000+ acres Facility size
- Solar glass, solar PV, battery cells, green hydrogen Production lines on site