Reinstalling a previously dismantled plant, including an 8m-wide, 600-tonne dryer and an 85m chimney, with six other Beck & Pollitzer business units supporting the Ukraine team.

The Challenge
Reinstalling major plant equipment through north-western Ukraine winter conditions
A repeat global client required a plant dismantled a year earlier in Bischweier, Germany, to be reinstalled in Ukraine. The work included welding and assembling an 8m-wide, 600-tonne dryer and erecting an 85m chimney, with winter temperatures in the region falling below -15°C.
Our Solution
Ukraine team supported by six other business units for installation and specialist welding
The project brought together Beck & Pollitzer teams from Ukraine, Germany, Hungary, Czech Republic, Poland, Romania and Russia. Specialist welding support was provided for the dryer assembly as part of the machinery installation work, with welding equipment preheated using propane burners to manage the freezing conditions.
The Outcome
Ukraine team supported by six other business units for the dryer and chimney work
Beck & Pollitzer Ukraine worked with support from teams in Germany, Hungary, Czech Republic, Poland, Romania and Russia, combining local installation resources with specialist welding support for the dryer and chimney work.
- Client: Repeat global industrial client
- Location: North-western Ukraine
- Sector: Other Industries
- Programme: Plant reinstallation, dryer assembly and chimney erection
- Timeline: Started November 2020

110-tonne and 40-tonne press installation in Žacléř
- 2 Presses installed
- 110 tonnes + 40 tonnes Press weights
- gantry + VersaLift 40/60 + 5-tonne FLT + 10-m cherry picker Handling

1,000-tonne press installation in the Czech Republic
- 1,000 tonnes Press capacity
- 500+ Project hours
- 10 hours Working day

Installation of two vertical presses in the Czech Republic
- 2 Presses installed
- 103 tons and 43 tons Press weights
- 10 hours Working day

Mechanical and electrical installation for a UK plastic recycling plant
- 2 Sorting and wash lines
- 3 Erema extruders
- 1 Water treatment plant

25,000 lb hydraulic brake press installation in South Carolina
- 25,000 lb Press weight
- 15,000 lb Forklift capacity
- VersaLift + rigging booms Main handling equipment

Robotic cell and manual assembly line installation in North Carolina
- 28 Manual stations
- 4 Robotic cells
- 15,000+ lb Heavy robot

Rigging two 1,600+ ton injection moulding machines in South Carolina
- 2 Machines
- 1,600+ tons each Weight
- 130 tons Crane

30-tonne turbine installation and pipe connection in France
- 30 tonnes Heaviest equipment
- positioning + pipe connection + pressure testing + modifications Scope
Beck & Pollitzer Industrial Intelligence™