Offloading, levelling and aligning two 1,600+ ton machines during a 13-hour shift in cold rain and through an elevated entry door.

The Challenge
Handling two oversized machines through an elevated entry during cold, wet weather
The South Carolina installation involved two injection moulding machines weighing more than 1,600 tons each. Offloading took place during below-normal May temperatures and pouring rain, with an elevated entry door adding to the handling constraint.
Our Solution
A five-person field crew used forklift, hoist and crane equipment for the lift and alignment
The heavy machinery installation used an 80k forklift, a 40/60 hoist lift and a 130-ton crane to offload the machines, move them into position, level them and complete alignment.
The Outcome
Both 1,600+ ton machines offloaded, levelled and aligned within the shift
Both machines were successfully offloaded, levelled and aligned within the tight schedule and site safety requirements.
- Client: Injection moulding manufacturer
- Location: Boiling Springs, South Carolina, USA
- Sector: Other Industries
- Programme: Heavy rigging and machine installation
- Timeline: 13-hour offloading shift

110-tonne and 40-tonne press installation in Žacléř
- 2 Presses installed
- 110 tonnes + 40 tonnes Press weights
- gantry + VersaLift 40/60 + 5-tonne FLT + 10-m cherry picker Handling

1,000-tonne press installation in the Czech Republic
- 1,000 tonnes Press capacity
- 500+ Project hours
- 10 hours Working day

Installation of two vertical presses in the Czech Republic
- 2 Presses installed
- 103 tons and 43 tons Press weights
- 10 hours Working day

Mechanical and electrical installation for a UK plastic recycling plant
- 2 Sorting and wash lines
- 3 Erema extruders
- 1 Water treatment plant

25,000 lb hydraulic brake press installation in South Carolina
- 25,000 lb Press weight
- 15,000 lb Forklift capacity
- VersaLift + rigging booms Main handling equipment

Robotic cell and manual assembly line installation in North Carolina
- 28 Manual stations
- 4 Robotic cells
- 15,000+ lb Heavy robot

Dryer and chimney reinstallation in Ukraine
- 600 tonnes Dryer
- 8m Dryer width
- 85m Chimney height

30-tonne turbine installation and pipe connection in France
- 30 tonnes Heaviest equipment
- positioning + pipe connection + pressure testing + modifications Scope
Beck & Pollitzer Industrial Intelligence™