Relocating and reassembling a 900 sq metre automated production line for electric drives.

The Challenge
Relocating a 900 sq metre automated line while dismantling and assembly ran in parallel
Our team in Germany carried out the relocation and assembly of a fully automated production line for an electric drives manufacturer, moving the 900 square metre interlinked line from Germany to France. Assembly at the French site ran at the same time as dismantling in Germany.
Our Solution
Simultaneous dismantling and reassembly, guided by laser calibration
While dismantling was under way in Germany, our team simultaneously carried out the assembly at the French destination, working from detailed technical documentation and prior measurements. Laser systems were used to calibrate the transport gantries, robot stations, gantry grippers, bending machines, gluing systems, laser welding and extraction systems, cooling tunnels, test cells and packaging units that made up the line.
Dismantling in Germany carried out in parallel with reassembly in France |
Assembly guided by detailed technical documentation and prior measurements |
Laser calibration used to align gantries, grippers, welding systems and other line components |
24 skilled workers deployed under dedicated project and assembly managers |
Health and safety standards maintained throughout the relocation |
Dismantling in Germany carried out in parallel with reassembly in France |
Assembly guided by detailed technical documentation and prior measurements |
Laser calibration used to align gantries, grippers, welding systems and other line components |
24 skilled workers deployed under dedicated project and assembly managers |
Health and safety standards maintained throughout the relocation |
-
Dismantling in Germany carried out in parallel with reassembly in France
-
Assembly guided by detailed technical documentation and prior measurements
-
Laser calibration used to align gantries, grippers, welding systems and other line components
-
24 skilled workers deployed under dedicated project and assembly managers
-
Health and safety standards maintained throughout the relocation
The Outcome
900 sq metre production line reassembled one week ahead of schedule
The production line was relocated from Germany to France and fully reassembled one week ahead of schedule, with laser systems used to calibrate key line components during assembly.
Need to know more?
- Client: Electric drives manufacturer
- Location: Germany → France
- Sector: Battery and Electrification
- Programme: Automated production line relocation

Technical rigging & retrofit: integrating a Gigafactory with more than 3,500 assets
- 29,467 Project hours
- 117 days Duration
- 3,506 Items relocated

HSE consultancy support for a major EV manufacturing facility in Saudi Arabia
- 10 months Programme length
- 100+ RAMS reviewed
- 500+ Observations closed

Scalable M&E installation: Automated storage & handling for a US battery facility
- 111,328 Project hours
- 15 months Programme length
- 100 Peak workforce

Voltage regulator production facility installation in the USA
- 275 Machines installed
- 250,000 sq ft Facility size
- 8 months Programme duration

Solar glass manufacturing line installation at a renewable energy gigafactory in India
- 6,000+ acres Facility size
- Solar glass, solar PV, battery cells, green hydrogen Production lines on site

Body shop installation for a new EV plant in India
- nearly 100 Containers unloaded
- 30 Trucks
- 50 Site team

EV manufacturing installation and process utility integration in India
- 10 months Programme duration
- 120 Site team
- 4 Towers erected

Battery cell plant electrical installation in France
- 45,000 Project hours
- 18 months Duration
- electrical integration and installation Scope