Transporting and assembling a 2,000-tonne press where low-bed trucks could not reach the assembly area, using an SPMT, gantry and multiple cranes.

The Challenge
Getting a 2,000-tonne press to an assembly area inaccessible to low-bed trucks
The automotive client required a 2,000-tonne Schuler press to be transported and installed in Bursa. Low-bed trucks could not access the press assembly area, so the delivery sequence needed a separate internal transport method after unloading.
The installation also required mechanical and electrical assembly, piping and multiple heavy lifts for the main press components.
Our Solution
SPMT transport followed by gantry and multi-crane assembly
The Turkey team unloaded the low-bed trucks and transferred the equipment to the assembly area using a Self-Propelled Modular Transporter (SPMT). A supervising team from Germany included site management, electrical, piping and commissioning personnel.
The press bed, slide and crown were assembled with a gantry. Cranes rated at 35, 75 and 120 tonnes were used for connecting rods, connecting-rod shafts, moving bolsters and tie-rod shaft equipment.
Low-bed trucks unloaded before internal transfer |
SPMT used because trucks could not access the assembly area |
Mechanical and electrical assembly and piping completed |
Press bed, slide and crown assembled using a gantry |
35-, 75- and 120-tonne cranes used for associated press components |
Cross-border supervision from Germany supported the Turkey team |
Low-bed trucks unloaded before internal transfer |
SPMT used because trucks could not access the assembly area |
Mechanical and electrical assembly and piping completed |
Press bed, slide and crown assembled using a gantry |
35-, 75- and 120-tonne cranes used for associated press components |
Cross-border supervision from Germany supported the Turkey team |
-
Low-bed trucks unloaded before internal transfer
-
SPMT used because trucks could not access the assembly area
-
Mechanical and electrical assembly and piping completed
-
Press bed, slide and crown assembled using a gantry
-
35-, 75- and 120-tonne cranes used for associated press components
-
Cross-border supervision from Germany supported the Turkey team
The Outcome
2,000-tonne press transported, assembled and installed in Bursa
The transport and installation project was completed, covering internal SPMT movement, press assembly, electrical work and piping.
- Client: Automotive manufacturer
- Location: Bursa, Turkey
- Sector: Automotive
- Programme: Heavy press installation
- Timeline: 411 project days

HSE consultancy support for a major EV manufacturing facility in Saudi Arabia
- 10 months Programme length
- 100+ RAMS reviewed
- 500+ Observations closed

Automated tyre plant installation in Tangier, Morocco
- 70,560 Planned project hours
- 120 days Duration
- multiple Plant zones

Vulcanisation press relocation from Tunisia to the Czech Republic
- 450 Project hours
- 30 days Duration
- 2 Countries

Body shop installation for a new EV plant in India
- nearly 100 Containers unloaded
- 30 Trucks
- 50 Site team

Multi-scope automotive summer shutdown upgrade in Hungary
- 2 weeks Shutdown window
- 20 years of accumulation Legacy cabling removed
- precision levelling and MEWP access Key methods

Nine-robot replacement during an automotive summer shutdown
- 9 Robots replaced
- 20 Team size

Tyre manufacturing plant installation in Tangier, Morocco
- 70,000+ Project hours
- 8+ months Duration
- 5+ km Conveyor systems

24-tonne TEF 220 press installation in the Czech Republic
- 24 tonnes Press weight
- 10 hours Working day
- PT5400 Gantry