Installing a new automotive process and welding equipment with mechanical and electrical scope while additional COVID-era health controls were in place.

The Challenge
Installing new process equipment while additional site-health controls were in force
The global car manufacturer required support for installation of a new process at its northern France facility during the COVID period. The scope included new welding equipment together with mechanical and electrical work.
Our Solution
Assembly, mounting and electrical work delivered under enhanced site-health requirements
The installation work covered assembly and mounting of the new process equipment plus mechanical and electrical installation of the welding systems.
PPE, additional healthcare measures and the applicable government safety guidance formed part of the Health & Safety controls during delivery.
Assembly and mounting of new process equipment |
Mechanical installation |
Electrical installation |
New welding equipment included |
PPE and additional COVID-era health measures applied |
Government safety guidance followed on site |
Assembly and mounting of new process equipment |
Mechanical installation |
Electrical installation |
New welding equipment included |
PPE and additional COVID-era health measures applied |
Government safety guidance followed on site |
-
Assembly and mounting of new process equipment
-
Mechanical installation
-
Electrical installation
-
New welding equipment included
-
PPE and additional COVID-era health measures applied
-
Government safety guidance followed on site
The Outcome
Mechanical and electrical installation of the new automotive process and welding equipment
The programme combined mechanical and electrical installation with the additional health controls required during the COVID period.
- Client: Global car manufacturer
- Location: Northern France
- Sector: Automotive
- Programme: New process and welding equipment installation

HSE consultancy support for a major EV manufacturing facility in Saudi Arabia
- 10 months Programme length
- 100+ RAMS reviewed
- 500+ Observations closed

Automated tyre plant installation in Tangier, Morocco
- 70,560 Planned project hours
- 120 days Duration
- multiple Plant zones

Vulcanisation press relocation from Tunisia to the Czech Republic
- 450 Project hours
- 30 days Duration
- 2 Countries

Body shop installation for a new EV plant in India
- nearly 100 Containers unloaded
- 30 Trucks
- 50 Site team

Multi-scope automotive summer shutdown upgrade in Hungary
- 2 weeks Shutdown window
- 20 years of accumulation Legacy cabling removed
- precision levelling and MEWP access Key methods

Nine-robot replacement during an automotive summer shutdown
- 9 Robots replaced
- 20 Team size

Tyre manufacturing plant installation in Tangier, Morocco
- 70,000+ Project hours
- 8+ months Duration
- 5+ km Conveyor systems

24-tonne TEF 220 press installation in the Czech Republic
- 24 tonnes Press weight
- 10 hours Working day
- PT5400 Gantry