Robotised underbody line replacement in the Czech Republic

Replacing 14 robots and 10 robot bases inside an automotive welding shop, including precision lifts over existing fences and equipment.

Czech Republic

The Challenge

Lifting replacement robots over fences and existing welding-shop equipment

The automotive manufacturer required an underbody line replacement covering 14 robots and ten robot bases inside a welding shop. The principal handling challenge was moving the robots over fences and other installed components.

The project also required mechanical and electrical dismantling, replacement positioning and reconnection of services and the exhaust system.


Our Solution

Three forklift configurations used for controlled robot movement and replacement

The 24-person team dismantled the existing equipment, relocated the new robots into position and reconnected the associated services and exhaust system.

Handling equipment included a 5.5-tonne electric Hyster forklift, a VersaLift 40/60 with crane jib and a 7-tonne Hyster forklift with crane jib. Safety planning formed part of the work throughout the 940 project hours.

Mechanical and electrical dismantling
Replacement of 14 robots and ten robot bases
Service and exhaust-system connections
5.5-tonne electric Hyster forklift
VersaLift 40/60 with crane jib
7-tonne Hyster forklift with crane jib
Mechanical and electrical dismantling
Replacement of 14 robots and ten robot bases
Service and exhaust-system connections
5.5-tonne electric Hyster forklift
VersaLift 40/60 with crane jib
7-tonne Hyster forklift with crane jib
Mechanical and electrical dismantling
Replacement of 14 robots and ten robot bases
Service and exhaust-system connections
5.5-tonne electric Hyster forklift
VersaLift 40/60 with crane jib
7-tonne Hyster forklift with crane jib
Mechanical and electrical dismantling
Replacement of 14 robots and ten robot bases
Service and exhaust-system connections
5.5-tonne electric Hyster forklift
VersaLift 40/60 with crane jib
7-tonne Hyster forklift with crane jib
  • Mechanical and electrical dismantling
  • Replacement of 14 robots and ten robot bases
  • Service and exhaust-system connections
  • 5.5-tonne electric Hyster forklift
  • VersaLift 40/60 with crane jib
  • 7-tonne Hyster forklift with crane jib

The Outcome

Underbody line replacement completed on time across 940 project hours

The project was completed on time after 940 project hours using a 24-person team.

Robots replaced
14
Robot bases
10
Team
24 operatives
Project hours
940
Project Details
  • Client: Automotive manufacturer
  • Location: Czech Republic
  • Sector: Automotive
  • Programme: Robotised underbody line replacement

Related Projects

Beck & Pollitzer Industrial Intelligence™

Industrial insight drawn from real-world delivery. Explore reports, articles and expert perspectives on the challenges shaping modern manufacturing and industrial programmes.
What manufacturers should consider before relocating production →
8 min

What manufacturers should consider before relocating production →

5 min read

What manufacturers should consider before relocating production →

5 min read

Your next project starts here

Whether you’re exploring an opportunity, planning a facility or preparing for installation,
our specialists can help you take the next step with confidence.
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.