Installing 120 tonnes of machinery and equipment at a new Hungarian manufacturing facility, including precision placement of a melting furnace and multi-OEM coordination.

The Challenge
Installing 120 tonnes of machinery from multiple OEMs inside a fixed 60-day programme
The Tier 1 automotive supplier required machinery and equipment installed at a new European headquarters and manufacturing facility. The 120-tonne equipment package included a melting furnace that required precise positioning, with several OEM interfaces to coordinate during the installation.
Our Solution
Heavy handling, precision furnace positioning and multi-OEM coordination under one installation programme
The team managed loading and unloading, internal movement, positioning and machinery installation using forklifts, cherry pickers and high-capacity cranes.
Project sequencing coordinated the installation programme and the interfaces between the client, OEM teams and site activities through the 60-day programme.
Loading and unloading of machinery and equipment |
Internal movement and positioning |
Precision placement of the melting furnace |
Mechanical installation of the equipment package |
Forklifts, cherry pickers and high-capacity cranes used |
Multiple OEM interfaces coordinated through the programme |
Loading and unloading of machinery and equipment |
Internal movement and positioning |
Precision placement of the melting furnace |
Mechanical installation of the equipment package |
Forklifts, cherry pickers and high-capacity cranes used |
Multiple OEM interfaces coordinated through the programme |
-
Loading and unloading of machinery and equipment
-
Internal movement and positioning
-
Precision placement of the melting furnace
-
Mechanical installation of the equipment package
-
Forklifts, cherry pickers and high-capacity cranes used
-
Multiple OEM interfaces coordinated through the programme
The Outcome
120 tonnes of machinery installed within the 60-day programme
The installation was completed within the stated 60-day timeframe, and no project issues were reported during delivery.
- Client: Tier 1 automotive parts supplier
- Location: Hungary
- Sector: Automotive
- Programme: Factory machinery installation
- Timeline: 60 days

HSE consultancy support for a major EV manufacturing facility in Saudi Arabia
- 10 months Programme length
- 100+ RAMS reviewed
- 500+ Observations closed

Automated tyre plant installation in Tangier, Morocco
- 70,560 Planned project hours
- 120 days Duration
- multiple Plant zones

Vulcanisation press relocation from Tunisia to the Czech Republic
- 450 Project hours
- 30 days Duration
- 2 Countries

Body shop installation for a new EV plant in India
- nearly 100 Containers unloaded
- 30 Trucks
- 50 Site team

Multi-scope automotive summer shutdown upgrade in Hungary
- 2 weeks Shutdown window
- 20 years of accumulation Legacy cabling removed
- precision levelling and MEWP access Key methods

Nine-robot replacement during an automotive summer shutdown
- 9 Robots replaced
- 20 Team size

Tyre manufacturing plant installation in Tangier, Morocco
- 70,000+ Project hours
- 8+ months Duration
- 5+ km Conveyor systems

24-tonne TEF 220 press installation in the Czech Republic
- 24 tonnes Press weight
- 10 hours Working day
- PT5400 Gantry